Project Information

RERA Certificate No.
P52000019615
Registration No.
REA52000049616
Registration Date
2021-09-09
Developer
VRINDAVAN LAND DEVELOPERS Partnership
Architect
KIRAN RAVINDRA TERSE
Project Bank
ICICI BANK LIMITED
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
2024-12-31
Total Units
114
Units Sold
25 (22%)
Buildings
2
Project Area
2432.00 sq.m
Total FSI
2420.23
Approved FSI
2420.23
MahaRERA QR
MADHUBAN
MahaRERA — P52000019615
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units66
🏡Residential66
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units48
🏡Residential48

Apartment Configurations

TYPE - A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL1909.72661848
27%

TYPE - B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL1162.4748246
4%

Construction Progress

TYPE - A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

TYPE - B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply50%
⬜Water conservation /Rain water harvesting