MAHAVIR SAPPHIRE

by MAHAVIR ESTATE AND PROPERTIES Partnership
Certificate Signed P99000048428
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000048428
Registration No.
REA99000123107
Registration Date
2023-01-03
Developer
MAHAVIR ESTATE AND PROPERTIES Partnership
Architect
Vastushilp Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
7
Units Sold
6 (86%)
Buildings
7
Project Area
1004.21 sq.m
Total FSI
1344.80
Approved FSI
1144.80
MahaRERA QR
MAHAVIR SAPPHIRE
MahaRERA — P99000048428
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31
🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31
🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31
🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31
🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31
🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31
🏗️Proposed Floors4
Sanctioned4
🏠Habitable3
🔢Total Units1
🏡Residential1
🅿️Closed Parking1
📅Completion2027-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 143.1199951171875 0 0 0
0%
Bungalow 152.88999938964844 0 0 0
0%
Bungalow 177.80999755859375 0 0 0
0%

Mahavir Sapphire 1

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 143.12 1 0 1
0%

Mahavir Sapphire 2

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 143.12 1 0 1
0%

Mahavir Sapphire 3

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 143.12 1 0 1
0%

Mahavir Sapphire 4

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 152.89 1 0 1
0%

Mahavir Sapphire 5

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 152.89 1 0 1
0%

Mahavir Sapphire 6

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 177.81 1 0 1
0%

Mahavir Sapphire 7

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 177.81 1 0 1
0%

Construction Progress

MAHAVIR SAPPHIRE 1

Basement (if any)100%

Mahavir Sapphire 1

Excavation100%

MAHAVIR SAPPHIRE 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Mahavir Sapphire 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAHAVIR SAPPHIRE 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%

Mahavir Sapphire 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing40%

MAHAVIR SAPPHIRE 1

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

MAHAVIR SAPPHIRE 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Mahavir Sapphire 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

MAHAVIR SAPPHIRE 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Mahavir Sapphire 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAHAVIR SAPPHIRE 2

Basement (if any)100%

Mahavir Sapphire 2

Excavation100%

MAHAVIR SAPPHIRE 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mahavir Sapphire 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MAHAVIR SAPPHIRE 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mahavir Sapphire 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

MAHAVIR SAPPHIRE 2

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MAHAVIR SAPPHIRE 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mahavir Sapphire 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAHAVIR SAPPHIRE 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mahavir Sapphire 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAHAVIR SAPPHIRE 3

Basement (if any)100%

Mahavir Sapphire 3

Excavation100%

MAHAVIR SAPPHIRE 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mahavir Sapphire 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MAHAVIR SAPPHIRE 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mahavir Sapphire 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

MAHAVIR SAPPHIRE 3

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MAHAVIR SAPPHIRE 3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mahavir Sapphire 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAHAVIR SAPPHIRE 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mahavir Sapphire 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAHAVIR SAPPHIRE 4

Basement (if any)100%

Mahavir Sapphire 4

Excavation100%

MAHAVIR SAPPHIRE 4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Mahavir Sapphire 4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAHAVIR SAPPHIRE 4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mahavir Sapphire 4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing77%

MAHAVIR SAPPHIRE 4

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MAHAVIR SAPPHIRE 4

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mahavir Sapphire 4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAHAVIR SAPPHIRE 4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mahavir Sapphire 4

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAHAVIR SAPPHIRE 5

Basement (if any)100%

Mahavir Sapphire 5

Excavation100%

MAHAVIR SAPPHIRE 5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Mahavir Sapphire 5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAHAVIR SAPPHIRE 5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mahavir Sapphire 5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing77%

MAHAVIR SAPPHIRE 5

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MAHAVIR SAPPHIRE 5

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mahavir Sapphire 5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAHAVIR SAPPHIRE 5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mahavir Sapphire 5

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAHAVIR SAPPHIRE 6

Basement (if any)100%

Mahavir Sapphire 6

Excavation100%

MAHAVIR SAPPHIRE 6

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Mahavir Sapphire 6

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAHAVIR SAPPHIRE 6

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mahavir Sapphire 6

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing69%

MAHAVIR SAPPHIRE 6

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 6

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%

MAHAVIR SAPPHIRE 6

Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%

Mahavir Sapphire 6

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

MAHAVIR SAPPHIRE 6

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Mahavir Sapphire 6

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAHAVIR SAPPHIRE 7

Basement (if any)100%

Mahavir Sapphire 7

Excavation100%

MAHAVIR SAPPHIRE 7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Mahavir Sapphire 7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAHAVIR SAPPHIRE 7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mahavir Sapphire 7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing69%

MAHAVIR SAPPHIRE 7

Plinth100%
Podiums (if any) 0%

Mahavir Sapphire 7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%

MAHAVIR SAPPHIRE 7

Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%

Mahavir Sapphire 7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

MAHAVIR SAPPHIRE 7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Mahavir Sapphire 7

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.