MEGASTONE HORIZON

by Megastone Spaces Partnership
Certificate SignedP99000052777
MEGASTONE HORIZONProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000052777
Registration No.
REA99000139443
Registration Date
2023-09-22
Developer
Megastone Spaces Partnership
Architect
SIDDHIVINAYAK ASSOCIATES
Project Bank
ICICI BANK LIMITED
Proposed Possession
2028-07-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
62
Units Sold
15 (24%)
Buildings
3
Project Area
1355.59 sq.m
Total FSI
3019.54
Approved FSI
3019.54
MahaRERA QR
MEGASTONE HORIZON
MahaRERA — P99000052777
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🏠Habitable5
🔢Total Units20
🏡Residential20
🏗️Proposed Floors6
Sanctioned6
🏠Habitable5
🔢Total Units26
🏡Residential26
🏗️Proposed Floors5
Sanctioned5
🏠Habitable4
🔢Total Units16
🏡Residential16

Apartment Configurations

TYPE A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.8514
20%
1BHK29.94523
40%
1BHK31.46505
0%
2BHK36.99505
0%

TYPE B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK28.14505
0%
1BHK30.19505
0%
1BHK32.16505
0%
1BHK33.95505
0%
1RK19.84101
0%
2BHK40.23514
20%

TYPE C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK26.3413
25%
1BHK27.46413
25%
2BHK36.53422
50%
2BHK41.41422
50%

Construction Progress

TYPE A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor30%

TYPE B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor30%

TYPE C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor30%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station
Energy managemcnt
Fire protection and fire safety requirements
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting