Metropolis - Aquaris Phase 1

by ANANT SQUARE Others
Certificate SignedP51700022961
Metropolis - Aquaris Phase 1Project photos will appear here when available.

Project Information

RERA Certificate No.
P51700022961
Registration No.
REA51700063421
Registration Date
2021-10-01
Developer
ANANT SQUARE Others
Architect
Ten Folds Architects & Consultants
Project Bank
HDFC BANK
Proposed Possession
2024-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
543.38 sq.m
Total FSI
3202.64
Approved FSI
3202.64
MahaRERA QR
Metropolis - Aquaris Phase 1
MahaRERA — P51700022961
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors9
✅Sanctioned9

Apartment Configurations

B1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.6728280
100%

B2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.6728280
100%

C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.7528280
100%

Construction Progress

B1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

B2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
✅CCTV in Entrance Lobby100%
⬜Community Buildings
✅DG Back up for Common areas100%
✅Electrical meter room, sub-station, receiving station100%
✅Energy managemcnt100%
✅Fire protection and fire safety requirements100%
✅Fitness center100%
✅Indoor games100%
⬜Internal Roads & Footpaths
✅Kids Play Area100%
✅Landscaping & Tree Planting100%
⬜Open Parking
✅Puzzle Parking Shared with Phase 2100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Stack Parkings in Stilt Shared with Phase 2100%
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%