📞 +91 98200 30685✉️
RERA: A51800043517

MITHILA COMPLEX

by NAVAL RAMBAHADUR SINGH
Kept in AbeyanceP99000022165

Project Information

RERA Certificate No.
P99000022165
Registration No.
REA99000059719
Developer
NAVAL RAMBAHADUR SINGH
Project Bank
HDFCBANK
Proposed Possession
2025-08-20
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
7310.00 sq.m
Total FSI
7066.90
Approved FSI
7066.90
MahaRERA QR
MITHILA COMPLEX
MahaRERA — P99000022165
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking15
🅿️Closed Parking1
📅Completion2024-08-20
🚗Open Parking15
🅿️Closed Parking3
📅Completion2024-08-20
🚗Open Parking15
🅿️Closed Parking1
📅Completion2024-08-20

Apartment Configurations

Arohi

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.94303
0%
1 BHK30.28202
0%
1 BHK36.56808
0%
1 BHK37.0816016
0%
1RK21.44101
0%
1RK22.08404
0%
1RK26.2616016
0%
2 BHK40.81202
0%
2 BHK49.17808
0%

Shivam Shubham

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.94505
0%
1 BHK30.28202
0%
1 BHK30.45101
0%
1 BHK36.5612012
0%
1 BHK37.0824024
0%
1RK21.44101
0%
1RK22.08505
0%
1RK26.2624024
0%
2 BHK40.81303
0%
2 BHK49.1712012
0%

Vibha

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.94303
0%
1 BHK30.28202
0%
1 BHK36.53404
0%
1 BHK36.56404
0%
1 BHK37.0816016
0%
1RK21.44101
0%
1RK22.08404
0%
1RK26.2616016
0%
2 BHK40.81202
0%
2 BHK49.17808
0%

Construction Progress

Arohi

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Shivam Shubham

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Vibha

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now