Mohan Park

by Sunil Purshottam Deshmukh Individual
Certificate SignedP51700022013
Mohan ParkProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700022013
Registration No.
REA51700059818
Registration Date
2021-09-08
Developer
Sunil Purshottam Deshmukh Individual
Architect
Gurunathan Jayavel Mudaliyar
Project Bank
UCO BANK
Proposed Possession
2027-07-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
112
Units Sold
53 (47%)
Buildings
4
Project Area
7850.00 sq.m
Total FSI
5832.40
Approved FSI
5832.40
MahaRERA QR
Mohan Park
MahaRERA — P51700022013
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors9
Sanctioned9
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors9
Sanctioned9
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors9
Sanctioned9
🏠Habitable7
🔢Total Units28
🏡Residential28

Apartment Configurations

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.014014
0%
2 BHK45.014014
0%

Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.01486
57%
2 BHK45.01459
36%

Building No 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.014104
71%
2 BHK45.014131
93%

Building No 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.01468
43%
2 BHK45.014104
71%

Construction Progress

BUILDING NO 2

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING NO 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises88%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING NO 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises92%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station60%
Energy managemcnt
Fire protection and fire safety requirements35%
Internal Roads & Footpaths63%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)75%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting25%
Treatment And Disposal Of Sewage And Sullage Water
Water Supply50%
Water conservation /Rain water harvesting45%