Project Information

RERA Certificate No.
P51800031723
Registration No.
REA51800096610
Registration Date
2024-06-21
Developer
Om Builders And Developers Partnership
Architect
SACHIN GAIKWAD
Project Bank
AXIS BANK
Proposed Possession
2027-03-31
Revised Possession
1900-01-01
Extended Possession
2024-06-30
Total Units
270
Units Sold
24 (9%)
Buildings
3
Project Area
1577.25 sq.m
Total FSI
9611.06
Approved FSI
9611.06
MahaRERA QR
Nahur Gaonthan Shiv Shakti Chs Ltd
MahaRERA — P51800031723
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
✅Sanctioned25
🏠Habitable23
🔢Total Units180
🏡Residential180
🏗️Proposed Floors11
✅Sanctioned11
🏠Habitable9
🔢Total Units81
🏡Residential81
🏗️Proposed Floors11
✅Sanctioned11
🏠Habitable9
🔢Total Units9
🏡Residential9

Apartment Configurations

WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK28.8422
50%
1BHK28.8913130
100%
1BHK29.08220
100%
1BHK Existing Tenant27.881610161
0%

WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK28.89431
75%
1BHK Existing Tenant27.8877077
0%

WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK61.78927
22%

Construction Progress

WING A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water99%
✅Water Supply
✅Water conservation /Rain water harvesting

Latest Mumbai Property News