Project Information

RERA Certificate No.
P51700010424
Registration No.
REA51700013951
Developer
Clean Construction Co.
Project Bank
DCB Bank
Proposed Possession
2018-12-31
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Buildings
2
Project Area
2546.15 sq.m
Total FSI
5352.78
Approved FSI
251.65
Litigations
⚠️ Yes
MahaRERA QR
Naiks Central Plaza
MahaRERA — P51700010424
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
⬇️Basements1
🅿️Closed Parking48
📅Completion2023-12-31

Apartment Configurations

Ashoka Heights

Type Carpet (sq.ft) Total Booked Available Status
Flat 20.87 20.87 1 1 0
100%
Flat 21.43 21.43 1 1 0
100%
Flat 21.45 21.45 10 7 3
70%
Flat 26.86 A 26.87 4 4 0
100%
Flat 26.87 26.87 4 4 0
100%
Flat 29.84 29.84 5 4 1
80%
Flat 30.00 30.0 10 8 2
80%
Flat 33.17 33.17 1 1 0
100%
Flat 33.53 33.53 4 3 1
75%
Flat 34.70 34.7 1 1 0
100%
Flat 34.91 34.91 1 1 0
100%
Flat 38.72 38.72 1 1 0
100%
Flat 38.88 38.88 1 0 1
0%
Flat 69.36 69.36 1 0 1
0%
Office 16.05 16.05 1 1 0
100%
Office 22.22 22.22 1 1 0
100%
Office 33.15 33.15 1 1 0
100%
Office 33.17 33.17 1 1 0
100%
Office 34.70 34.7 1 0 1
0%
Office 36.92 36.92 1 0 1
0%
Office 38.88 38.88 1 0 1
0%
Office 39.06 39.06 1 1 0
100%
Office 39.10 39.1 1 1 0
100%
Office 40.94 40.94 1 1 0
100%
Office 41.00 41.0 1 1 0
100%
Office 42.50 42.5 2 2 0
100%
Shop 12.07 12.07 1 1 0
100%
Shop 17.52 17.52 1 0 1
0%
Shop 23.27 23.27 1 1 0
100%
Shop 24.07 24.07 1 0 1
0%
Shop 35.55 35.55 1 1 0
100%
Shop 70.67 70.67 1 1 0
100%
Shop 72.34 72.34 1 1 0
100%
Shop 84.07 84.07 1 1 0
100%

Naiks Paradise

Type Carpet (sq.ft) Total Booked Available Status
Flat 56.95 56.95 1 1 0
100%
Flat 66.11 66.11 5 3 2
60%
Flat 66.11 A 66.11 1 0 1
0%
Flat 66.14 66.14 1 1 0
100%
Flat 66.49 66.49 5 4 1
80%
Flat 76.42 76.42 7 2 5
29%
Office 22.77 22.77 8 4 4
50%
Office 33.23 33.23 8 4 4
50%
Office 64.30 64.3 4 0 4
0%
Shop 22.73 22.73 1 1 0
100%
Shop 22.89 22.89 1 1 0
100%
Shop 24.18 24.18 1 0 1
0%
Shop 35.76 35.76 1 1 0
100%
Shop 36.51 36.51 1 0 1
0%
Shop 36.56 36.56 1 1 0
100%
Shop 59.65 59.65 1 1 0
100%

Construction Progress

Ashoka Heights

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing55%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Naiks Paradise

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing38%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.