📞 +91 98200 30685✉️
RERA: A51800043517

Narang Urbane Housing Forum-Phase I

by Yamuna Realty Private Limited
Kept in AbeyanceP99000004745

Project Information

RERA Certificate No.
P99000004745
Registration No.
REA99000016736
Developer
Yamuna Realty Private Limited
Architect
Ajay Wade
Project Bank
HDFC Bank Limited
Proposed Possession
2017-12-31
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Buildings
16
Project Area
3744.00 sq.m
Total FSI
5844.80
Approved FSI
2016.00
MahaRERA QR
Narang Urbane Housing Forum-Phase I
MahaRERA — P99000004745
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion2020-12-31

Apartment Configurations

Twin Block 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1A102.62101
0%
1B102.62101
0%

Twin Block 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
10A102.62101
0%
10B102.62101
0%

Twin Block 11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
11A102.62101
0%
11B102.62101
0%

Twin Block 12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
12A102.62101
0%
12B102.62101
0%

Twin Block 13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
13A102.62101
0%
13B102.62101
0%

Twin Block 14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
14A102.62110
100%
14B102.62110
100%

Twin Block 15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
15A102.62110
100%
15B102.62110
100%

Twin Block 16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
16A102.62101
0%
16B102.62101
0%

Twin Block 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2A102.62101
0%
2B102.62101
0%

Twin Block 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3A102.62110
100%
3B102.62110
100%

Twin Block 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
4A102.62110
100%
4B102.62110
100%

Twin Block 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
5A102.62101
0%
5B102.62110
100%

Twin Block 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
6A102.62101
0%
6B102.62110
100%

Twin Block 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
7A102.62101
0%
7B102.62101
0%

Twin Block 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
8A102.62101
0%
8B102.62101
0%

Twin Block 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
9A102.62110
100%
9B102.62101
0%

Construction Progress

Twin Block 1

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 10

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 11

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 12

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 13

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 14

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 15

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 16

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 2

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 3

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 4

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 5

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 6

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 7

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 8

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

Twin Block 9

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station10%
Energy management
Fire Protection And Fire Safety Requirements90%
Landscaping & Tree Planting60%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)30%
Solid Waste Management And Disposal
Storm Water Drains60%
Street Lighting10%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply50%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now