Narang Urbane Housing Forum-Phase I

by Yamuna Realty Private Limited
Certificate SignedP99000004745
Narang Urbane Housing Forum-Phase IProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000004745
Registration No.
REA99000016736
Developer
Yamuna Realty Private Limited
Architect
Ajay Wade
Project Bank
HDFC Bank Limited
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
16
Project Area
3744.00 sq.m
Total FSI
5844.80
Approved FSI
2016.00
MahaRERA QR
Narang Urbane Housing Forum-Phase I
MahaRERA — P99000004745
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2
🏗️Proposed Floors2
✅Sanctioned2

Apartment Configurations

TWIN BLOCK 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1A102.62101
0%
1B102.62101
0%

TWIN BLOCK 10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
10A102.62101
0%
10B102.62101
0%

TWIN BLOCK 11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
11A102.62101
0%
11B102.62101
0%

TWIN BLOCK 12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
12A102.62101
0%
12B102.62101
0%

TWIN BLOCK 13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
13A102.62101
0%
13B102.62101
0%

TWIN BLOCK 14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
14A102.62110
100%
14B102.62110
100%

TWIN BLOCK 15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
15A102.62110
100%
15B102.62110
100%

TWIN BLOCK 16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
16A102.62101
0%
16B102.62101
0%

TWIN BLOCK 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2A102.62101
0%
2B102.62101
0%

TWIN BLOCK 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3A102.62110
100%
3B102.62110
100%

TWIN BLOCK 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
4A102.62110
100%
4B102.62110
100%

TWIN BLOCK 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
5A102.62101
0%
5B102.62110
100%

TWIN BLOCK 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
6A102.62101
0%
6B102.62110
100%

TWIN BLOCK 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
7A102.62101
0%
7B102.62101
0%

TWIN BLOCK 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
8A102.62101
0%
8B102.62101
0%

TWIN BLOCK 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
9A102.62110
100%
9B102.62101
0%

Construction Progress

TWIN BLOCK 1

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 10

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 11

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 12

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 13

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 14

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 15

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 16

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 2

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 3

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 4

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 5

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 6

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 7

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 8

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

TWIN BLOCK 9

Basement (if any)85%
Excavation85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Plinth85%
Podiums (if any)0%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station10%
⬜Energy managemcnt
✅Fire protection and fire safety requirements90%
✅Internal Roads & Footpaths60%
✅Landscaping & Tree Planting60%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)30%
✅Solid Waste Management And Disposal
✅Storm Water Drains60%
✅Street Lighting10%
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply50%
⬜Water conservation /Rain water harvesting