Netarwala Compound

by Mukon Constructions Pvt. Ltd.
Kept in AbeyanceP51900012419
Netarwala CompoundProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900012419
Registration No.
REA51900017899
Developer
Mukon Constructions Pvt. Ltd.
Project Bank
Vijaya Bank
Proposed Possession
2008-07-31
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Buildings
2
Project Area
6657.22 sq.m
Total FSI
12226.59
MahaRERA QR
Netarwala Compound
MahaRERA — P51900012419
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
🅿️Closed Parking29
📅Completion1900-01-01

Apartment Configurations

Building One

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Residential20.925653203
21%

Building Two

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Residential25.01840184
0%

Construction Progress

Building One

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises60%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building Two

Excavation2%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space30%
✅Community Buildings50%
✅Electrical Meter Room, Sub-Station, Receiving Station50%
⬜Energy management
✅Fire Protection And Fire Safety Requirements
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Conservation, Rain water Harvesting
✅Water Supply