📞 +91 98200 30685✉️
RERA: A51800043517

NINE STAR PRIDE 1 BUILDING NO 01

by NINE HOME DEVELOPERS Partnership
Certificate SignedP99000020434

Project Information

RERA Certificate No.
P99000020434
Registration No.
REA99000055044
Registration Date
2021-09-09
Developer
NINE HOME DEVELOPERS Partnership
Architect
Ar Roshan Patil
Project Bank
HDFC BANK
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
2138.80 sq.m
Total FSI
2138.80
Approved FSI
2138.80
MahaRERA QR
NINE STAR PRIDE 1 BUILDING NO 01
MahaRERA — P99000020434
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
📅Completion2023-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2023-12-31

Apartment Configurations

Building No 01 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK20.87110
100%
1 BHK24.5419712
37%
1 BHK27.73440
100%
2 BHK38.03440
100%
A SHOP 0110.47110
100%
A SHOP 029.72110
100%
A SHOP 0310.28101
0%
A SHOP 0410.93101
0%
A SHOP 0514.23101
0%
A SHOP 0611.04101
0%
A SHOP 079.7101
0%

Building No 01 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK20.87101
0%
1 BHK24.5418711
39%
1 BHK27.73440
100%
1 RK16.01110
100%
2 BHK38.03422
50%
B SHOP 089.7110
100%
B SHOP 0911.04101
0%
B SHOP 1014.23101
0%
B SHOP 1110.93110
100%
B SHOP 1210.28101
0%
B SHOP 139.72101
0%
B SHOP 1410.47101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Rk16.010000228881836000
0%
1Bhk20.8700008392334000
0%
1Bhk24.540000915527344000
0%
1Bhk27.729999542236328000
0%
2Bhk38.029998779296875000
0%
A Shop 0110.470000267028809000
0%
A Shop 029.720000267028809000
0%
A Shop 0310.279999732971191000
0%
A Shop 0410.930000305175781000
0%
A Shop 0514.229999542236328000
0%
A Shop 0611.039999961853027000
0%
A Shop 079.699999809265137000
0%
B Shop 089.699999809265137000
0%
B Shop 0911.039999961853027000
0%
B Shop 1014.229999542236328000
0%
B Shop 1110.930000305175781000
0%
B Shop 1210.279999732971191000
0%
B Shop 139.720000267028809000
0%
B Shop 1410.470000267028809000
0%

Construction Progress

BUILDING NO 01 WING A

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

BUILDING NO 01 WING B

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building No 01 Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building No 01 Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now