RERA: A51800043517

NINESTAR HEAVEN BLDG NO 3

by NINE HOMEMAKERS Partnership
Certificate Signed P99000045841
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000045841
Registration No.
REA99000106552
Registration Date
2022-06-15
Developer
NINE HOMEMAKERS Partnership
Architect
Roshan Patil
Project Bank
HDFC BANK
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
100
Units Sold
25 (25%)
Buildings
2
Project Area
4538.75 sq.m
Total FSI
4538.75
Approved FSI
4538.75
MahaRERA QR
NINESTAR HEAVEN BLDG NO 3
MahaRERA — P99000045841
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units50
🏡Residential42
🏢Non-Residential8
📅Completion2026-12-31
🏗️Proposed Floors8
Sanctioned8
🔢Total Units50
🏡Residential42
🏢Non-Residential8
📅Completion2026-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 32.95000076293945 0 0 0
0%
2Bhk 43.43000030517578 0 0 0
0%
Shop 7.389999866485596 0 0 0
0%
Shop 9.40999984741211 0 0 0
0%
Shop 10.25 0 0 0
0%
Shop 11.569999694824219 0 0 0
0%
Shop 13.130000114440918 0 0 0
0%

Bldg No 3 Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.95 35 0 35
0%
2 BHK 43.43 7 0 7
0%
Shop 7.39 1 0 1
0%
Shop 9.41 1 0 1
0%
Shop 10.25 1 0 1
0%
Shop 11.57 1 0 1
0%
Shop 13.13 4 0 4
0%

Bldg No 3 Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.95 35 0 35
0%
2 BHK 43.43 7 0 7
0%
Shop 7.39 1 0 1
0%
Shop 10.25 2 0 2
0%
Shop 11.57 1 0 1
0%
Shop 13.13 4 0 4
0%

Construction Progress

BLDG NO 3 WING A

Basement (if any)100%

Bldg No 3 Wing A

Excavation100%

BLDG NO 3 WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Bldg No 3 Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BLDG NO 3 WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Bldg No 3 Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BLDG NO 3 WING A

Plinth100%
Podiums (if any) 0%

Bldg No 3 Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BLDG NO 3 WING A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure40%

Bldg No 3 Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BLDG NO 3 WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Bldg No 3 Wing A

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure4%

BLDG NO 3 WING B

Basement (if any)0%

Bldg No 3 Wing B

Excavation0%

BLDG NO 3 WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Bldg No 3 Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BLDG NO 3 WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Bldg No 3 Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

BLDG NO 3 WING B

Plinth0%
Podiums (if any) 0%

Bldg No 3 Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BLDG NO 3 WING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Bldg No 3 Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BLDG NO 3 WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Bldg No 3 Wing B

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.