Nishuvi Rehab Phase

by Nishuvi Corporation
Kept in AbeyanceP51900003953
Nishuvi Rehab PhaseProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900003953
Registration No.
REA51900010123
Developer
Nishuvi Corporation
Project Bank
ORIENTAL BANK OF COMMERCE
Proposed Possession
2020-07-31
Revised Possession
2027-12-30
Extended Possession
1900-01-01
Buildings
2
Project Area
9874.63 sq.m
Total FSI
3863.48
MahaRERA QR
Nishuvi Rehab Phase
MahaRERA — P51900003953
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
📅Completion1900-01-01

Apartment Configurations

Building A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
NON RESIDENTIAL 132.3101
0%
NON RESIDENTIAL 233.89101
0%

Building B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
NON RESIDENTIAL 1272.13303
0%
RESIDENTIAL TYPE 127.0786086
0%

Construction Progress

Building A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing93%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building B

Excavation60%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing31%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums100%
X number of Slabs of Super Structure0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical Meter Room, Sub-Station, Receiving Station
⬜Energy management
✅Fire Protection And Fire Safety Requirements
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Conservation, Rain water Harvesting
✅Water Supply50%