Project Information

RERA Certificate No.
P51700078241
Registration No.
REA51700164670
Registration Date
2024-11-29
Developer
SHREE SWAMI SAMARTH ENTERPRISES Partnership
Architect
RIGHT SPACE CONSULTANTS
Project Bank
G P PARSIK BANK
Proposed Possession
2027-12-31
Total Units
191
Units Sold
69 (36%)
Buildings
4
Project Area
2000.00 sq.m
Total FSI
5751.37
Approved FSI
3500.59
MahaRERA QR
NIYATI LAKE CROWN - Wing A
MahaRERA — P51700078241
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable7
🔢Total Units76
🏡Residential67
🏢Non-Residential9
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units38
🏡Residential26
🏢Non-Residential12
🏗️Proposed Floors4
✅Sanctioned4
🏠Habitable3
🔢Total Units3
🏡Residential3
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units74
🏡Residential74

Apartment Configurations

NIYATI LAKE CROWN WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK34.65202
0%
1BHK35.3202
0%
1BHK35.6714014
0%
1BHK35.86101
0%
1BHK36.33101
0%
1BHK36.6606
0%
1BHK36.9811011
0%
1BHK37.0712012
0%
1BHK37.35606
0%
1BHK37.44606
0%
1BHK38.0606
0%
Office space13.43101
0%
Office space24.96101
0%
Office space30.27101
0%
Office space40.45101
0%
Shop12.22101
0%
Shop13.0101
0%
Shop15.03101
0%
Shop16.77101
0%

Construction Progress

NIYATI LAKE CROWN WING A - Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
Stilt Floor0%

NIYATI LAKE CROWN WING B - Wing B

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

NIYATI LAKE CROWN WING C - Wing C

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

NIYATI LAKE CROWN WING D - Wing D

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now