OASIS AND GENESIS

by SEA CREST CONSTRUCTION Partnership
Certificate SignedP99000009868
OASIS AND GENESISProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000009868
Registration No.
REA99000021254
Registration Date
2017-08-22
Developer
SEA CREST CONSTRUCTION Partnership
Architect
Nishant Patil Vastu Shilp Associates
Project Bank
AXIS BANK
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
2011.49 sq.m
Total FSI
2031.62
Approved FSI
2031.62
MahaRERA QR
OASIS AND GENESIS
MahaRERA — P99000009868
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5

Apartment Configurations

GENISIS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT33.59532
60%
FLAT33.83541
80%
FLAT34.85541
80%
FLAT35.99321
67%
FLAT50.69220
100%
SHOP7.53110
100%
SHOP7.77110
100%
SHOP8.01220
100%
SHOP8.98110
100%
SHOP9.85110
100%
SHOP11.77220
100%
SHOP11.89110
100%
SHOP12.74110
100%
SHOP13.43110
100%
SHOP13.97110
100%

OASIS

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT33.59523
40%
FLAT34.85514
20%
FLAT39.59514
20%
SHOP7.77110
100%
SHOP8.01211
50%
SHOP8.01220
100%
SHOP9.85110
100%
SHOP11.77220
100%

Construction Progress

GENISIS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

OASIS

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%

Latest Mumbai Property News