OMKAR VASTU COMPLEX

by OMKAR DEVELOPERS
Certificate SignedP99000031421
OMKAR VASTU COMPLEXProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000031421
Registration No.
REA99000095701
Developer
OMKAR DEVELOPERS
Architect
SIDDHIVINAYAK ASSOCIATES
Project Bank
AXIS BANK LTD
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
141
Units Sold
39 (28%)
Buildings
4
Project Area
3000.00 sq.m
Total FSI
6656.50
MahaRERA QR
OMKAR VASTU COMPLEX
MahaRERA — P99000031421
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable5
🔢Total Units29
🏡Residential29
🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable5
🔢Total Units44
🏡Residential44
🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable5
🔢Total Units45
🏡Residential45
🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable5
🔢Total Units23
🏡Residential23

Apartment Configurations

BUILDING NO 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.97101
0%
1BHK31.19606
0%
1BHK31.2116016
0%
1RK19.19606
0%

BUILDING NO 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK33.16505
0%
1BHK34.9922022
0%
1RK19.1912012
0%
2BHK41.57505
0%

BUILDING NO 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.66505
0%
1BHK30.79606
0%
1BHK31.31505
0%
1BHK31.64505
0%
1BHK32.3606
0%
1RK19.3606
0%
2BHK39.39606
0%
2BHK39.87606
0%

BUILDING NO 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.09101
0%
1BHK30.31505
0%
1BHK30.6517017
0%

Construction Progress

BUILDING NO 1

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 2

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 3

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING NO 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
⬜Community Buildings
⬜Electrical meter room, sub-station, receiving station
✅Energy managemcnt100%
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Open Parking100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%