OSTWAL WONDER CITYProject photos will appear here when available.
Project Information
RERA Certificate No.
P99000006909
Registration No.
REA99000011505
Registration Date
2021-09-10
Developer
SHREE OSTWAL BUILDERS LTD Company
Architect
Anjali Associates
Project Bank
INDUSIND BANK
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
33
Project Area
66595.27 sq.m
Total FSI
49884.55
Approved FSI
49884.55
OSTWAL WONDER CITY MahaRERA — P99000006909
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors4
✅Sanctioned4
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors5
✅Sanctioned5
Apartment Configurations
SCHOOL BUILDING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
SCHOOL BUILDING
1238.4
1
0
1
0%
WONDER CITY - A-1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
APARTMENT
15.29
1
1
0
100%
APARTMENT
16.42
1
1
0
100%
APARTMENT
17.27
1
0
1
0%
APARTMENT
18.12
1
0
1
0%
APARTMENT
18.15
1
1
0
100%
APARTMENT
18.82
1
0
1
0%
APARTMENT
20.11
1
0
1
0%
APARTMENT
21.26
1
0
1
0%
APARTMENT
22.73
1
0
1
0%
APARTMENT
23.25
1
1
0
100%
APARTMENT
23.41
1
1
0
100%
APARTMENT
27.83
1
1
0
100%
APARTMENT
42.47
1
1
0
100%
APARTMENT
47.29
9
8
1
89%
APARTMENT
47.37
1
1
0
100%
APARTMENT
47.65
1
1
0
100%
APARTMENT
61.93
9
8
1
89%
APARTMENT
62.4
1
1
0
100%
SHOP
15.35
1
1
0
100%
SHOP
16.7
1
1
0
100%
SHOP
17.22
1
1
0
100%
SHOP
17.42
1
1
0
100%
SHOP
18.31
1
1
0
100%
SHOP
19.08
1
1
0
100%
SHOP
19.98
1
1
0
100%
SHOP
21.13
1
1
0
100%
SHOP
23.13
1
1
0
100%
SHOP
23.24
1
1
0
100%
SHOP
23.52
1
1
0
100%
SHOP
23.66
1
1
0
100%
SHOP
23.8
1
1
0
100%
SHOP
28.18
1
1
0
100%
WONDER CITY - A-4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
16.42
1
1
0
100%
1RK
18.12
2
2
0
100%
1RK
18.26
1
1
0
100%
1RK
19.97
2
2
0
100%
1RK
20.11
2
2
0
100%
1RK
21.26
3
3
0
100%
1RK
27.83
1
1
0
100%
1RK
34.49
1
1
0
100%
2BHK
45.46
10
10
0
100%
3BHK
61.93
10
8
2
80%
SHOP
16.7
1
1
0
100%
SHOP
18.31
2
2
0
100%
SHOP
18.41
2
2
0
100%
SHOP
19.98
2
2
0
100%
SHOP
20.16
2
2
0
100%
SHOP
21.13
2
2
0
100%
SHOP
28.18
2
2
0
100%
WONDER CITY - A-5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
45.46
12
9
3
75%
3BHK
58.49
12
8
4
67%
WONDER CITY - A-6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
16.13
1
1
0
100%
1RK
18.39
1
1
0
100%
1RK
19.44
1
1
0
100%
1RK
20.41
1
1
0
100%
1RK
51.32
1
1
0
100%
2BHK
47.77
10
10
0
100%
SHOP
4.13
1
1
0
100%
SHOP
16.32
1
1
0
100%
SHOP
18.24
2
2
0
100%
SHOP
19.29
2
2
0
100%
SHOP
20.72
1
1
0
100%
WONDER CITY - B-1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
17.96
1
0
1
0%
1RK
19.97
2
0
2
0%
1RK
21.11
1
0
1
0%
1RK
21.88
1
0
1
0%
1RK
22.68
1
0
1
0%
1RK
26.02
1
0
1
0%
2BHK
45.46
16
14
2
88%
2BHK
49.76
2
0
2
0%
SHOP
18.15
1
0
1
0%
SHOP
19.84
2
0
2
0%
SHOP
20.98
1
0
1
0%
SHOP
22.16
1
0
1
0%
SHOP
22.99
1
0
1
0%
WONDER CITY - B-2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
45.05
24
20
4
83%
WONDER CITY - B-3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
45.05
24
23
1
96%
WONDER CITY - B-4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
45.14
24
24
0
100%
SHOP
5.61
1
1
0
100%
SHOP
16.5
1
1
0
100%
SHOP
18.15
4
4
0
100%
SHOP
20.09
4
4
0
100%
SHOP
21.26
4
4
0
100%
WONDER CITY - B-5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
17.96
1
1
0
100%
1RK
19.97
2
2
0
100%
1RK
21.11
1
1
0
100%
1RK
21.88
1
1
0
100%
1RK
22.68
1
1
0
100%
1RK
26.02
1
1
0
100%
2BHK
45.46
16
15
1
94%
2BHK
49.76
2
2
0
100%
SHOP
18.15
1
1
0
100%
SHOP
19.84
2
2
0
100%
SHOP
20.98
1
1
0
100%
SHOP
22.16
1
1
0
100%
SHOP
22.99
1
1
0
100%
WONDER CITY - C-1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.49
3
3
0
100%
2BHK
41.82
12
12
0
100%
2BHK
44.5
9
9
0
100%
2BHK
46.15
2
2
0
100%
SHOP
8.2
1
1
0
100%
SHOP
9.41
1
1
0
100%
SHOP
12.72
1
1
0
100%
SHOP
15.3
1
1
0
100%
SHOP
18.97
3
3
0
100%
SHOP
19.18
3
3
0
100%
SHOP
19.56
1
1
0
100%
WONDER CITY - C-2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.49
3
3
0
100%
2BHK
41.8
15
15
0
100%
2BHK
44.5
6
6
0
100%
SHOP
6.49
1
1
0
100%
SHOP
14.61
1
1
0
100%
SHOP
15.61
1
1
0
100%
SHOP
15.64
1
1
0
100%
SHOP
17.11
1
0
1
0%
SHOP
18.56
4
4
0
100%
SHOP
18.76
4
4
0
100%
SHOP
19.04
1
1
0
100%
SHOP
21.4
1
0
1
0%
SHOP
21.64
1
0
1
0%
SHOP
22.53
1
0
1
0%
WONDER CITY - C-3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.49
3
2
1
67%
2BHK
41.8
15
15
0
100%
2BHK
44.5
6
5
1
83%
SHOP
6.49
1
1
0
100%
SHOP
14.61
1
0
1
0%
SHOP
15.61
1
0
1
0%
SHOP
15.64
1
0
1
0%
SHOP
17.11
1
0
1
0%
SHOP
18.56
4
1
3
25%
SHOP
18.76
4
0
4
0%
SHOP
19.04
1
0
1
0%
SHOP
21.4
1
0
1
0%
SHOP
21.64
1
0
1
0%
SHOP
22.53
1
0
1
0%
WONDER CITY - C-4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.49
3
3
0
100%
2BHK
41.82
12
12
0
100%
2BHK
44.5
9
9
0
100%
2BHK
46.15
2
2
0
100%
SHOP
8.2
1
1
0
100%
SHOP
9.41
1
1
0
100%
SHOP
12.72
1
1
0
100%
SHOP
15.3
1
1
0
100%
SHOP
18.97
3
2
1
67%
SHOP
19.18
3
2
1
67%
SHOP
19.56
1
1
0
100%
WONDER CITY - C-5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.67
18
18
0
100%
2BHK
46.02
4
4
0
100%
SHOP
5.06
1
1
0
100%
SHOP
15.66
1
1
0
100%
SHOP
17.12
1
1
0
100%
SHOP
17.24
1
1
0
100%
SHOP
18.56
2
2
0
100%
SHOP
18.76
2
2
0
100%
WONDER CITY - C-6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.68
18
18
0
100%
2BHK
46.02
2
2
0
100%
SHOP
5.35
1
1
0
100%
SHOP
15.31
1
1
0
100%
SHOP
16.05
1
1
0
100%
SHOP
16.09
1
0
1
0%
SHOP
18.97
3
3
0
100%
SHOP
19.18
5
5
0
100%
SHOP
19.34
1
1
0
100%
SHOP
21.25
1
1
0
100%
WONDER CITY - C-7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
41.67
18
17
1
94%
2BHK
46.02
4
4
0
100%
SHOP
5.06
1
1
0
100%
SHOP
15.66
1
1
0
100%
SHOP
17.12
1
1
0
100%
SHOP
17.24
1
1
0
100%
SHOP
18.56
2
2
0
100%
SHOP
18.76
2
2
0
100%
WONDER CITY - C-8
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
40.38
3
3
0
100%
2BHK
41.4
12
12
0
100%
2BHK
46.09
6
6
0
100%
WONDER CITY - D-1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
24
0
100%
1BHK
33.87
4
4
0
100%
SHOP
5.05
1
1
0
100%
SHOP
6.16
1
1
0
100%
SHOP
8.76
3
2
1
67%
SHOP
11.92
4
4
0
100%
SHOP
16.8
4
3
1
75%
WONDER CITY - D-10
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.29
30
30
0
100%
1BHK
34.0
10
10
0
100%
WONDER CITY - D-2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
24
0
100%
1BHK
33.87
4
4
0
100%
SHOP
5.05
1
1
0
100%
SHOP
6.16
1
1
0
100%
SHOP
8.76
3
3
0
100%
SHOP
11.92
4
2
2
50%
SHOP
16.8
4
3
1
75%
WONDER CITY - D-3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
24
0
100%
1BHK
33.63
8
8
0
100%
WONDER CITY - D-4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
24
0
100%
1BHK
33.63
8
8
0
100%
WONDER CITY - D-5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
24
0
100%
1BHK
33.63
8
8
0
100%
WONDER CITY - D-6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
24
0
100%
1BHK
33.63
8
8
0
100%
WONDER CITY - D-7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.29
30
30
0
100%
1BHK
34.0
10
10
0
100%
WONDER CITY - D-8
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.29
30
30
0
100%
1BHK
34.0
10
10
0
100%
WONDER CITY - D-9
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
45.08
24
24
0
100%
2BHK
52.04
5
5
0
100%
SHOP
16.61
3
3
0
100%
SHOP
18.52
2
2
0
100%
SHOP
22.12
4
4
0
100%
WONDER CITY - E-1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
28.63
24
23
1
96%
1BHK
33.63
8
8
0
100%
WONDER CITY - E-2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
28.63
24
22
2
92%
2BHK
33.63
8
7
1
88%
WONDER CITY - E-3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
40.38
3
0
3
0%
2BHK
41.4
12
12
0
100%
2BHK
46.09
6
4
2
67%
WONDER CITY -A-2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
16.42
1
0
1
0%
1RK
18.12
2
0
2
0%
1RK
18.26
1
0
1
0%
1RK
19.97
2
1
1
50%
1RK
20.11
2
1
1
50%
1RK
21.26
3
0
3
0%
1RK
27.83
1
1
0
100%
1RK
28.49
1
1
0
100%
APARTMENT
45.46
10
9
1
90%
APARTMENT
61.93
10
8
2
80%
SHOP
16.7
1
1
0
100%
SHOP
18.31
2
2
0
100%
SHOP
18.41
2
2
0
100%
SHOP
19.98
2
2
0
100%
SHOP
20.16
2
2
0
100%
SHOP
21.13
2
2
0
100%
SHOP
28.18
2
2
0
100%
WONDER CITY -A-3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1RK
16.42
1
1
0
100%
1RK
18.12
2
2
0
100%
1RK
18.26
1
1
0
100%
1RK
19.97
2
2
0
100%
1RK
20.11
2
2
0
100%
1RK
21.26
3
3
0
100%
1RK
27.83
1
1
0
100%
1RK
34.49
1
1
0
100%
2BHK
45.46
10
9
1
90%
3BHK
61.93
10
9
1
90%
SHOP
16.7
1
1
0
100%
SHOP
18.31
2
2
0
100%
SHOP
18.41
2
2
0
100%
SHOP
19.98
2
2
0
100%
SHOP
20.16
2
2
0
100%
SHOP
21.13
2
2
0
100%
SHOP
28.18
2
2
0
100%
Construction Progress
SCHOOL BUILDING
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - A-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - A-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - A-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - A-6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - B-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - B-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - B-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - B-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - B-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - C-8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-10
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - D-9
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - E-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - E-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY - E-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY -A-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
WONDER CITY -A-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RERA Registered Amenities
✅Aggregate area of recreational Open Space100%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Open Parking100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
⬜Treatment And Disposal Of Sewage And Sullage Water