PALMVISTA A1 & A2

by GLORY TOWNSHIP LLP
Certificate SignedP51700023234
PALMVISTA A1 & A2Project photos will appear here when available.

Project Information

RERA Certificate No.
P51700023234
Registration No.
REA51700065638
Developer
GLORY TOWNSHIP LLP
Architect
10 Folds Architects &Amp; Consultants
Project Bank
HDFC BANK LTD
Proposed Possession
2025-03-28
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
7500.00 sq.m
Total FSI
8067.82
MahaRERA QR
PALMVISTA A1 & A2
MahaRERA — P51700023234
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
✅Sanctioned20
🏠Habitable18
🏗️Proposed Floors19
✅Sanctioned19
🏠Habitable18

Apartment Configurations

A1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK40.2469663
9%

A2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK40.2451447
8%
2BHK58.7552151
2%
Shop25.6101
0%
Shop26.05101
0%
Shop30.47101
0%
Shop37.78101
0%
Shop43.3101
0%
Shop44.78101
0%
Shop49.85101
0%
Shop251.08101
0%

Construction Progress

A1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

A2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station90%
✅Energy managemcnt90%
✅Fire protection and fire safety requirements90%
✅Internal Roads & Footpaths80%
✅Landscaping & Tree Planting50%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)80%
✅Solid Waste Management And Disposal
✅Storm Water Drains80%
✅Street Lighting50%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply80%
✅Water conservation /Rain water harvesting100%