PARAMOUNT ENCLAVE BLDG NO 3A 3B

by SUN INFRA
Certificate SignedP99000017504
PARAMOUNT ENCLAVE BLDG NO 3A 3BProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000017504
Developer
SUN INFRA
Project Bank
axis bank limited
Proposed Possession
2029-04-30
Revised Possession
1900-01-01
Extended Possession
2028-12-31
Units Sold
0
Buildings
1
Project Area
5295.00 sq.m
Total FSI
5714.00
MahaRERA QR
PARAMOUNT ENCLAVE BLDG NO 3A 3B
MahaRERA — P99000017504
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
✅Sanctioned9

Apartment Configurations

PARAMOUNT ENCLAVE BLDG NO 3A 3B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
TYPE 129.63803644
45%
TYPE 10 SHOP10.75413
25%
TYPE 11 SHOP10.96422
50%
TYPE 221.2216214
12%
TYPE 334.921468
43%
TYPE 433.031468
43%
TYPE 534.0424186
75%
TYPE 626.941284
67%
TYPE 746.41422
50%
TYPE 8 SHOP11.6853
62%
TYPE 9 SHOP16.06844
50%

Construction Progress

PARAMOUNT ENCLAVE BLDG NO 3A 3B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
✅Community Buildings100%
✅Electrical meter room, sub-station, receiving station50%
⬜Energy managemcnt
✅Fire protection and fire safety requirements10%
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting50%
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%