Project Information

RERA Certificate No.
P99000011450
Registration No.
REA99000019500
Registration Date
2017-08-31
Developer
PARMARBUILDTECH Partnership
Architect
Encon
Project Bank
IDBI BANK
Proposed Possession
2020-07-31
Revised Possession
2020-07-31
Extended Possession
2024-07-30
Units Sold
0
Buildings
2
Project Area
7800.00 sq.m
Total FSI
7800.84
Approved FSI
6690.84
MahaRERA QR
PARMAR JEWEL RESIDENCY
MahaRERA — P99000011450
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
Sanctioned14
📅Completion2022-07-31
🏗️Proposed Floors4
Sanctioned4
📅Completion2019-01-08

Apartment Configurations

A Wing , B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK34.7512111
92%
1 BHK37.1612102
83%
1 BHK38.461293
75%
1 BHK38.5512102
83%
1 BHK40.2324240
100%
2 BHK51.9312120
100%
2 BHK53.5112111
92%
2 BHK60.571183
73%
2 BHK60.7612102
83%
3 BHK78.9722139
59%
4 BHK107.53110
100%
SHOP 159.08110
100%
SHOP 2 AND 310.82220
100%
SHOP 4 AND 512.16220
100%
SHOP 68.73110
100%
SHOP 733.66101
0%

Parmar Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
GALA47.38440
100%
GALA65.03660
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Bhk34.75000
0%
1 Bhk37.15999984741211000
0%
1 Bhk38.459999084472656000
0%
1Bhk38.54999923706055000
0%
1Bhk40.22999954223633000
0%
2Bhk51.93000030517578000
0%
2Bhk53.5099983215332000
0%
2Bhk60.56999969482422000
0%
2Bhk60.7599983215332000
0%
3Bhk78.97000122070312000
0%
4Bhk107.52999877929688000
0%
Gala47.380001068115234000
0%
Gala65.02999877929688000
0%
Shop 159.08000183105469000
0%
Shop 2 And 310.819999694824219000
0%
Shop 4 And 512.15999984741211000
0%
Shop 68.729999542236328000
0%
Shop 733.65999984741211000
0%

Construction Progress

A WING , B WING

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks83%

A Wing , B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises76%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.83%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure93%

PARMAR BUILDING NO 2

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Parmar Building No 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space50%
Community Buildings100%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements10%
Landscaping & Tree Planting50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)80%
Solid Waste Management And Disposal
Storm Water Drains80%
Street Lighting60%
Treatment And Disposal Of Sewage And Sullage Water70%
Water Conservation, Rain water Harvesting60%
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now