List propertyWhatsApp
Best dealsNew projectsProjects mapBuy a flatRent a flatCommercialBuilders & developersWhy usRERA searchLocalitiesTools & calculatorsNRI hubNews+ List your propertyWhatsApp us
Mumbai property advisory & dataOperating since 1995✓ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

Plot No. 11 Sector-8 New Panvel West Bus Terminus

by CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED Company
Certificate SignedP52000028195
Plot No. 11 Sector-8 New Panvel West Bus TerminusProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000028195
Registration No.
REA52000084486
Registration Date
2021-09-08
Developer
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED Company
Project Bank
STATE BANK OF INDIA
Proposed Possession
2027-11-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
176
Units Sold
104 (59%)
Buildings
3
Project Area
5532.73 sq.m
Total FSI
11757.05
Approved FSI
6275.06
MahaRERA QR
Plot No. 11 Sector-8 New Panvel West Bus Terminus
MahaRERA — P52000028195
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors1
✅Sanctioned1
🏠Habitable1
🔢Total Units4
🏢Non-Residential4
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable11
🔢Total Units86
🏡Residential86
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable11
🔢Total Units86
🏡Residential86

Apartment Configurations

Commercial

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Shop17.59101
0%
Shop21.88101
0%
Shop32.27101
0%
Shop33.66101
0%

E-B-01

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.110010
0%
1BHK27.1276076
0%

E-B-02

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.110010
0%
1BHK27.1276076
0%

Construction Progress

Commercial

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

E-B-01

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
Stilt Floor100%

E-B-02

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station75%
⬜Energy managemcnt
✅Fire protection and fire safety requirements65%
✅Internal Roads & Footpaths5%
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
✅Solid Waste Management And Disposal
✅Storm Water Drains45%
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply65%
✅Water conservation /Rain water harvesting