Plot No -1A,Sector -19, Vashi Truck Terminal

by City And Industrial Development Corporation Of Maharashtra Limited Company
Certificate SignedP51700030100
Plot No -1A,Sector -19, Vashi Truck TerminalProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700030100
Registration No.
REA51700092340
Registration Date
2021-07-31
Developer
City And Industrial Development Corporation Of Maharashtra Limited Company
Project Bank
STATE BANK OF INDIA
Proposed Possession
2029-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
3179
Units Sold
0 (0%)
Buildings
16
Project Area
55963.09 sq.m
Total FSI
118921.57
Approved FSI
106553.40
MahaRERA QR
Plot No -1A,Sector -19, Vashi Truck Terminal
MahaRERA — P51700030100
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units185
🏡Residential185
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units188
🏡Residential185
🏢Non-Residential3
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units189
🏡Residential185
🏢Non-Residential4
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units188
🏡Residential185
🏢Non-Residential3
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units189
🏡Residential185
🏢Non-Residential4
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units287
🏡Residential274
🏢Non-Residential13
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units288
🏡Residential274
🏢Non-Residential14
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units277
🏡Residential274
🏢Non-Residential3
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable25
🔢Total Units278
🏡Residential274
🏢Non-Residential4
🏗️Proposed Floors1
✅Sanctioned1

Apartment Configurations

Commercial

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Shop31.0322022
0%
Shop31.87404
0%
Shop38.65101
0%

E-B -02

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%

E-B-03

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%

E-B-04

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%

E-B-05

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.1218018
0%

E-B-07

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%

E-B-08

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%

E-B-09

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%

E-B-11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%
Shop98.11202
0%
Shop103.39101
0%

E-B-12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%
Shop87.87202
0%
Shop99.22202
0%

E-B-13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%
Shop98.11202
0%
Shop103.39101
0%

E-B-14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.118018
0%
1 BHK27.121670167
0%
Shop87.87101
0%
Shop89.21101
0%
Shop99.22202
0%

E-C -06

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.120020
0%
1 BHK27.122540254
0%

E-C-01

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.120020
0%
1 BHK27.122540254
0%

E-C-10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.120020
0%
1 BHK27.122540254
0%
Shop73.6101
0%
Shop98.11101
0%
Shop100.13101
0%

E-C-15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.120020
0%
1 BHK27.122540254
0%
Shop97.92101
0%
Shop98.38101
0%
Shop104.61101
0%
Shop108.73101
0%

Construction Progress

E-B -02

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-03

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises7%
Slabs of Super Structure81%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-04

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure71%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-05

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises27%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-07

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure81%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-08

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises32%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-09

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure79%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-11

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-12

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-13

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-B-14

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)10%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure21%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-C -06

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure27%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-C-01

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)25%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

E-C-10

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

E-C-15

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

NA

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting