Project Information

RERA Certificate No.
P52000032944
Registration No.
REA52000102185
Registration Date
2022-02-02
Developer
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED Company
Project Bank
STATE BANK OF INDIA
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
17
Project Area
63607.16 sq.m
Total FSI
104288.79
Approved FSI
96371.50
MahaRERA QR
Plot No -7, Sector -1A, Kharghar
MahaRERA โ€” P52000032944
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors9
โœ…Sanctioned9
๐Ÿ…ฟ๏ธClosed Parking28
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors9
โœ…Sanctioned9
๐Ÿ…ฟ๏ธClosed Parking28
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors9
โœ…Sanctioned9
๐Ÿ…ฟ๏ธClosed Parking28
๐Ÿ“…Completion2024-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ…ฟ๏ธClosed Parking58
๐Ÿ“…Completion2026-12-31

Apartment Configurations

L -C-13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-01

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-02

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-03

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-04

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-05

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-06

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-07

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-08

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-09

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-10

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK47.2255055
0%

L-C-11

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.2255055
0%

L-C-12

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.2255055
0%

L-C-14

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

L-C-17

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK47.221170117
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2Bhk47.22999954223633000
0%

Construction Progress

L -C-13

Basement (if any)66%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth66%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-01

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-02

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-03

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-04

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-05

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises61%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-06

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-07

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-08

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises54%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-09

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises56%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises1%
Slabs of Super Structure14%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-11

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-12

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-14

Basement (if any)99%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth99%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure11%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-15

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises3%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-16

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

L-C-17

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises4%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โœ…Community Buildings
โœ…Electrical Meter Room, Sub-Station, Receiving Station
โฌœEnergy management
โœ…Fire Protection And Fire Safety Requirements
โœ…Landscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Conservation, Rain water Harvesting
โœ…Water Supply
CallWhatsApp
โœ‰๏ธ

Get in Touch

Our team will connect with you shortly

+91
๐Ÿ”’ Your details are secure with us
โšก If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
๐Ÿ‘‹ Looking for the right project? Let me help you find it!
๐Ÿ—๏ธ
MPE Project Advisor
โ— Online now