Poonam Estate Cluster-Ii Building No 4,5,6

by Unique Shanti Ventures Llp Partnership
Certificate SignedP51700055810
Poonam Estate Cluster-Ii Building No 4,5,6Project photos will appear here when available.

Project Information

RERA Certificate No.
P51700055810
Registration No.
REA51700154943
Registration Date
2024-04-22
Developer
Unique Shanti Ventures Llp Partnership
Architect
SQUARE ARCHITECTS
Project Bank
AXIS BANK
Proposed Possession
2028-04-30
Total Units
365
Units Sold
135 (37%)
Buildings
3
Project Area
11244.45 sq.m
Total FSI
26937.83
Approved FSI
26937.83
MahaRERA QR
Poonam Estate Cluster-Ii Building No 4,5,6
MahaRERA — P51700055810
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
✅Sanctioned24
🏠Habitable20
🔢Total Units122
🏡Residential116
🏢Non-Residential6
🏗️Proposed Floors24
✅Sanctioned24
🏠Habitable20
🔢Total Units121
🏡Residential115
🏢Non-Residential6
🏗️Proposed Floors24
✅Sanctioned24
🏠Habitable20
🔢Total Units122
🏡Residential116
🏢Non-Residential6

Apartment Configurations

B-2, BUILDING NO 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK58.1740634
15%
2BHK58.5840634
15%
3BHK77.136432
11%
Shop162.28202
0%
Shop266.18202
0%
Shop276.3202
0%

B-3, BUILDING NO 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK58.1739435
10%
2BHK58.5839633
15%
3BHK77.137829
22%
Shop162.28202
0%
Shop227.28202
0%
Shop276.3202
0%

B-4, BUILDING NO 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK58.1740832
20%
2BHK58.5840832
20%
3BHK77.136432
11%
Shop162.28202
0%
Shop266.18202
0%
Shop276.3202
0%

Construction Progress

B-2, BUILDING NO 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor100%

B-3, BUILDING NO 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor100%

B-4, BUILDING NO 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting