📞 +91 98200 30685✉️
RERA: A51800043517

Poonam Prime

by Prime Developers Partnership
Certificate SignedP99000006206

Project Information

RERA Certificate No.
P99000006206
Registration No.
REA99000012263
Registration Date
2017-08-14
Developer
Prime Developers Partnership
Architect
Shah Gattani Consultants
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2019-01-01
Revised Possession
2019-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
874.94 sq.m
Total FSI
874.65
Approved FSI
874.65
MahaRERA QR
Poonam Prime
MahaRERA — P99000006206
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors4
Sanctioned4
⬇️Basements1
📅Completion1900-01-01

Apartment Configurations

Poonam Prime

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Basement246.28110
100%
First Floor280.51110
100%
Second Floor280.51110
100%
Shop 114.7101
0%
Shop 217.32101
0%
Shop 321.28101
0%
Shop 423.91202
0%
Shop 528.03202
0%
Shop 632.14202
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Basement246.27999877929688000
0%
First Floor280.510009765625000
0%
Second Floor280.510009765625000
0%
Shop 114.699999809265137000
0%
Shop 217.31999969482422000
0%
Shop 321.280000686645508000
0%
Shop 423.90999984741211000
0%
Shop 528.030000686645508000
0%
Shop 632.13999938964844000
0%

Construction Progress

Poonam Prime

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station90%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply98%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.