📞 +91 98200 30685 ✉️
RERA: A51800043517

Prestige Jasdan Classic

by Prestige Estates Projects Limited
Certificate Signed P51900031285
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900031285
Registration No.
REA51900095121
Registration Date
2024-08-20
Developer
Prestige Estates Projects Limited
Project Bank
STATE BANK OF INDIA
Proposed Possession
2025-12-31
Units Sold
0
Project Area
8692.00 sq.m
Total FSI
33325.30
Approved FSI
33325.30
MahaRERA QR
Prestige Jasdan Classic
MahaRERA — P51900031285
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors50
Sanctioned50
🏠Habitable45
🏗️Proposed Floors50
Sanctioned50
🏠Habitable45

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk Type A 78.08000183105469 0 0 0
0%
2 Bhk Type A1 78.08000183105469 0 0 0
0%
3 Bhk Type B 111.12000274658203 0 0 0
0%
3 Bhk Type B1 112.12999725341797 0 0 0
0%
3 Bhk Type B2 117.43000030517578 0 0 0
0%
3 Bhk Type B3 118.43000030517578 0 0 0
0%
3 Bhk Type B4 134.7100067138672 0 0 0
0%
3 Bhk Type C 150.07000732421875 0 0 0
0%
3 Bhk Type C1 150.89999389648438 0 0 0
0%
4 Bhk Type D 203.49000549316406 0 0 0
0%
4 Bhk Type D1 203.8800048828125 0 0 0
0%
4 Bhk Type D2 203.49000549316406 0 0 0
0%
4 Bhk Type D3 203.8800048828125 0 0 0
0%
4 Bhk Type D4 203.8800048828125 0 0 0
0%
4 Bhk Type E 161.39999389648438 0 0 0
0%
Multipurpose Area 50.900001525878906 0 0 0
0%
Multipurpose Area 51.77000045776367 0 0 0
0%
Multipurpose Area 89.5999984741211 0 0 0
0%

Construction Progress

East Tower - Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
Stilt Floor 100%

West Tower - Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure71%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
Stilt Floor 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.