PRIME NEW HORIZON

by PRASHANT CHANDRAKANT BHOIR Individual
Certificate SignedP52000004080
PRIME NEW HORIZONProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000004080
Registration No.
REA52000018070
Registration Date
2017-08-07
Developer
PRASHANT CHANDRAKANT BHOIR Individual
Architect
Mangesh Bhalchandra Mhatre
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2018-03-30
Revised Possession
2018-03-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1214.50 sq.m
Total FSI
1455.18
Approved FSI
1455.18
MahaRERA QR
PRIME NEW HORIZON
MahaRERA — P52000004080
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors4
✅Sanctioned4
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6

Apartment Configurations

PRIME NEW HORIZON BUILDING 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK22.84110
100%
1BHK29.39110
100%
1BHK32.06110
100%
1BHK33.95110
100%
1BHK36.55110
100%
3BHK73.16110
100%

PRIME NEW HORIZON BUILDING 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.87440
100%
1BHK37.36220
100%
1BHK37.83440
100%
1BHK39.65220
100%
2BHK45.72220
100%
2BHK48.05220
100%

PRIME NEW HORIZON BUILDING 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.9202
0%
1BHK34.39321
67%
1BHK35.22844
50%
1RK27.32110
100%
2BHK44.89330
100%
2BHK52.32110
100%

Construction Progress

PRIME NEW HORIZON BUILDING 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

PRIME NEW HORIZON BUILDING 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

PRIME NEW HORIZON BUILDING 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises52%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station75%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)75%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water75%
✅Water Supply75%
⬜Water conservation /Rain water harvesting