Project Information

RERA Certificate No.
P99000045321
Registration No.
REA99000107194
Registration Date
2022-06-06
Developer
SUPER REALTY Partnership
Architect
Nishant P Patil
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2025-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
1
Units Sold
1 (100%)
Buildings
7
Project Area
2792.25 sq.m
Total FSI
2230.10
Approved FSI
2230.10
MahaRERA QR
QUEENS VILLA - 2
MahaRERA — P99000045321
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
Sanctioned3
🚗Open Parking1
📅Completion2025-03-31
🏗️Proposed Floors3
Sanctioned3
🔢Total Units1
🏡Residential1
🚗Open Parking1
🅿️Closed Parking1
📅Completion2025-03-31
🏗️Proposed Floors4
Sanctioned4
🚗Open Parking1
🅿️Closed Parking1
📅Completion2025-03-31
🏗️Proposed Floors3
Sanctioned3
🚗Open Parking1
🅿️Closed Parking1
📅Completion2025-03-31
🏗️Proposed Floors3
Sanctioned3
🚗Open Parking1
🅿️Closed Parking1
📅Completion2025-03-31
🏗️Proposed Floors3
Sanctioned3
🚗Open Parking1
📅Completion2025-03-25
🏗️Proposed Floors3
Sanctioned3
🚗Open Parking1
📅Completion2025-03-31

Apartment Configurations

Bangalow No 6 Type D

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 175.75 0 0 0
0%

Bungalow No 01, Type A

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 207.4 0 0 0
0%

Bungalow No 2 Type A-1

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 207.4 0 0 0
0%

Bungalow No 3 Type B

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 207.4 0 0 0
0%

Bungalow No 4 Type B-1

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 210.7 0 0 0
0%

Bungalow No 5 Type C

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 207.32 0 0 0
0%

Bungalow No 7 Type -E

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 390.87 0 0 0
0%

Construction Progress

BANGALOW NO 6 TYPE D

Basement (if any)100%

Bangalow No 6 Type D

Excavation100%

BANGALOW NO 6 TYPE D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Bangalow No 6 Type D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BANGALOW NO 6 TYPE D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Bangalow No 6 Type D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing69%

BANGALOW NO 6 TYPE D

Plinth100%
Podiums (if any) 0%

Bangalow No 6 Type D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%

BANGALOW NO 6 TYPE D

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Bangalow No 6 Type D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BANGALOW NO 6 TYPE D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bangalow No 6 Type D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUNGALOW NO 01, TYPE A

Basement (if any)100%

Bungalow No 01, Type A

Excavation100%

BUNGALOW NO 01, TYPE A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Bungalow No 01, Type A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW NO 01, TYPE A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Bungalow No 01, Type A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%

BUNGALOW NO 01, TYPE A

Plinth100%
Podiums (if any) 0%

Bungalow No 01, Type A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises75%

BUNGALOW NO 01, TYPE A

Sanitary Fittings within the flats / premises75%
Slabs of Super Structure100%

Bungalow No 01, Type A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUNGALOW NO 01, TYPE A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow No 01, Type A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUNGALOW NO 2 TYPE A-1

Basement (if any)100%

Bungalow No 2 Type A-1

Excavation100%

BUNGALOW NO 2 TYPE A-1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Bungalow No 2 Type A-1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW NO 2 TYPE A-1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Bungalow No 2 Type A-1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

BUNGALOW NO 2 TYPE A-1

Plinth100%
Podiums (if any) 0%

Bungalow No 2 Type A-1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUNGALOW NO 2 TYPE A-1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Bungalow No 2 Type A-1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUNGALOW NO 2 TYPE A-1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow No 2 Type A-1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUNGALOW NO 3 TYPE B

Basement (if any)100%

Bungalow No 3 Type B

Excavation100%

BUNGALOW NO 3 TYPE B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Bungalow No 3 Type B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW NO 3 TYPE B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Bungalow No 3 Type B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises25%

BUNGALOW NO 3 TYPE B

Plinth100%
Podiums (if any) 0%

Bungalow No 3 Type B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUNGALOW NO 3 TYPE B

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Bungalow No 3 Type B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

BUNGALOW NO 3 TYPE B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow No 3 Type B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUNGALOW NO 4 TYPE B-1

Basement (if any)100%

Bungalow No 4 Type B-1

Excavation100%

BUNGALOW NO 4 TYPE B-1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Bungalow No 4 Type B-1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW NO 4 TYPE B-1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Bungalow No 4 Type B-1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

BUNGALOW NO 4 TYPE B-1

Plinth100%
Podiums (if any) 0%

Bungalow No 4 Type B-1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUNGALOW NO 4 TYPE B-1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Bungalow No 4 Type B-1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUNGALOW NO 4 TYPE B-1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow No 4 Type B-1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUNGALOW NO 5 TYPE C

Basement (if any)100%

Bungalow No 5 Type C

Excavation100%

BUNGALOW NO 5 TYPE C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Bungalow No 5 Type C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW NO 5 TYPE C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Bungalow No 5 Type C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing79%

BUNGALOW NO 5 TYPE C

Plinth100%
Podiums (if any) 0%

Bungalow No 5 Type C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUNGALOW NO 5 TYPE C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Bungalow No 5 Type C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUNGALOW NO 5 TYPE C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow No 5 Type C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUNGALOW NO 7 TYPE -E

Basement (if any)100%

Bungalow No 7 Type -E

Excavation100%

BUNGALOW NO 7 TYPE -E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Bungalow No 7 Type -E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW NO 7 TYPE -E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

Bungalow No 7 Type -E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing66%

BUNGALOW NO 7 TYPE -E

Plinth100%
Podiums (if any) 0%

Bungalow No 7 Type -E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%

BUNGALOW NO 7 TYPE -E

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Bungalow No 7 Type -E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUNGALOW NO 7 TYPE -E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow No 7 Type -E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
ELECTRIC METER ROOM SUBSTATION RECEIVING STATION
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains 75%
Street Lighting 50%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.