Radha Nilaya Phase 2

by Kishore Anand Shetty
Certificate SignedP99000079268
Radha Nilaya Phase 2Project photos will appear here when available.

Project Information

RERA Certificate No.
P99000079268
Registration No.
REA99000165799
Registration Date
2025-02-25
Developer
Kishore Anand Shetty
Architect
Himesh Gupta & Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2031-04-30
Total Units
117
Units Sold
24 (21%)
Buildings
3
Project Area
5500.00 sq.m
Total FSI
18514.95
Approved FSI
6514.95
MahaRERA QR
Radha Nilaya Phase 2
MahaRERA — P99000079268
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units49
🏡Residential49
🏗️Proposed Floors5
Sanctioned5
🏠Habitable5
🔢Total Units26
🏡Residential26
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units42
🏡Residential42

Apartment Configurations

Residential Bldg No 2 - Krishnakunj Bldg No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK28.17707
0%
1BHK28.52707
0%
1BHK28.6528028
0%
1BHK29.43707
0%

Residential Bldg No 3 A Wing - Krishnakunj Bldg No

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.41404
0%
1BHK27.87404
0%
1BHK28.61303
0%
1BHK28.65303
0%
1RK23.75101
0%
2BHK46.67303
0%
2BHK47.54404
0%
2BHK47.99404
0%

Residential Bldg No 3 B Wing - Krishnakunj Bldg No

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.48707
0%
1BHK27.75707
0%
1BHK28.0707
0%
1BHK29.47707
0%
2BHK43.05707
0%
2BHK47.79707
0%

Construction Progress

Residential Bldg No 2 - Krishnakunj Bldg No 2

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
Stilt Floor100%

Residential Bldg No 3 A Wing - Krishnakunj Bldg No

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Residential Bldg No 3 B Wing - Krishnakunj Bldg No

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station
Energy managemcnt
Fire protection and fire safety requirements
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting