Radhe Krishna Residency

by Mangalam Infra Partnership
Certificate SignedP51700022023
Radhe Krishna ResidencyProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700022023
Registration No.
REA51700059766
Registration Date
2021-09-08
Developer
Mangalam Infra Partnership
Architect
Vinay Patil & Associates
Project Bank
DCB BANK LIMITED
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
6750.00 sq.m
Total FSI
13618.77
Approved FSI
9630.24
MahaRERA QR
Radhe Krishna Residency
MahaRERA — P51700022023
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
Sanctioned14
🏗️Proposed Floors14
Sanctioned14
🏗️Proposed Floors13
Sanctioned13

Apartment Configurations

A -Building

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK31.6511101
91%
1BHK32.2313130
100%
1BHK32.6513112
85%
1BHK32.8413121
92%
1BHK34.5726224
85%
1BHK36.9924159
62%
2BHK46.01220
100%
2BHK49.0613121
92%

B -Building

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK25.95770
100%
1BHK27.42752
71%
1BHK28.46743
57%
1BHK30.4713121
92%
1BHK30.99761
86%
1BHK31.74440
100%
1BHK33.15660
100%
1BHK35.0660
100%
2BHK37.16743
57%
2BHK37.72770
100%
2BHK43.08660
100%

C -Building

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.62523
40%
1BHK30.98514
20%
1BHK31.26541
80%
1BHK32.03550
100%
1BHK32.98550
100%
1BHK33.15770
100%
1BHK36.37660
100%
1BHK37.54660
100%
2BHK38.46523
40%
2BHK40.25550
100%
2BHK44.92871
88%
2BHK48.35880
100%
2BHK52.86220
100%

Construction Progress

A -Building

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

B -Building

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

C -Building

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings
Electrical meter room, sub-station, receiving station100%
Energy managemcnt
Fire protection and fire safety requirements100%
Internal Roads & Footpaths100%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water100%
Water Supply
Water conservation /Rain water harvesting100%