Raj Regalia Phase-2

by Amrut Laxmi Developers
Certificate SignedP51700034369
Raj Regalia Phase-2Project photos will appear here when available.

Project Information

RERA Certificate No.
P51700034369
Registration No.
REA51700105457
Registration Date
2024-04-10
Developer
Amrut Laxmi Developers
Architect
PIYUSH BANSAL
Project Bank
PUNJAB NATIONAL BANK
Proposed Possession
2027-06-30
Revised Possession
1900-01-01
Extended Possession
2026-06-30
Total Units
245
Units Sold
172 (70%)
Buildings
2
Project Area
4518.44 sq.m
Total FSI
16182.88
Approved FSI
16182.88
MahaRERA QR
Raj Regalia Phase-2
MahaRERA — P51700034369
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable13
🔢Total Units128
🏡Residential109
🏢Non-Residential19
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable13
🔢Total Units117
🏡Residential102
🏢Non-Residential15

Apartment Configurations

BUILDING NO 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK38.7202
0%
1BHK39.66562234
39%
2BHK54.96202
0%
2BHK59.82471730
36%
2BHK63.2202
0%
Shop33.43660
100%
Shop38.381183
73%
Shop46.15220
100%

BUILDING NO 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK38.7211
50%
1BHK39.66541638
30%
2BHK59.82431528
35%
2BHK63.2101
0%
Shop24.75110
100%
Shop33.43660
100%
Shop38.38761
86%
Shop46.15110
100%

Construction Progress

BUILDING NO 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING NO 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting