📞 +91 98200 30685 ✉️
RERA: A51800043517

RAJVIR ESTATE NO.2

by RAJVIR ENTERPRISE Partnership
Certificate Signed P99000077374
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000077374
Registration No.
REA99000160353
Registration Date
2024-08-09
Developer
RAJVIR ENTERPRISE Partnership
Architect
Amit Patil
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2029-01-31
Total Units
71
Units Sold
0 (0%)
Project Area
3531.00 sq.m
Total FSI
4588.57
Approved FSI
4588.57
MahaRERA QR
RAJVIR ESTATE NO.2
MahaRERA — P99000077374
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
🏠Habitable5
🔢Total Units26
🏡Residential20
🏢Non-Residential6
🏗️Proposed Floors2
Sanctioned2
🏠Habitable2
🔢Total Units45
🏢Non-Residential45

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.530000686645508 0 0 0
0%
Gala 41.040000915527344 0 0 0
0%
Gala 41.849998474121094 0 0 0
0%
Gala 45.650001525878906 0 0 0
0%
Gala 45.83000183105469 0 0 0
0%
Gala 45.970001220703125 0 0 0
0%
Gala 46.650001525878906 0 0 0
0%
Gala 59.400001525878906 0 0 0
0%
Gala 67.36000061035156 0 0 0
0%
Gala 70.30000305175781 0 0 0
0%
Gala 70.72000122070312 0 0 0
0%
Gala 73.95999908447266 0 0 0
0%
Gala 74.77999877929688 0 0 0
0%
Gala 74.95999908447266 0 0 0
0%
Shop 10.25 0 0 0
0%
Shop 12.020000457763672 0 0 0
0%
Shop 12.09000015258789 0 0 0
0%

Construction Progress

RAJVIR DREAMS

Basement (if any)100%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

RAJVIR INDUSTRIAL

Basement (if any)100%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.