RAPID RESIDENCYProject photos will appear here when available.
Project Information
RERA Certificate No.
P52000010355
Registration No.
REA52000019855
Registration Date
2020-06-16
Developer
PARK VIEW DEVELOPERS Partnership
Architect
Ery Sppaces
Project Bank
AXIS BANK
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
11
Project Area
17499.66 sq.m
Total FSI
17748.88
Approved FSI
17748.88
RAPID RESIDENCY MahaRERA — P52000010355
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors9
✅Sanctioned9
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors10
✅Sanctioned10
🏗️Proposed Floors10
✅Sanctioned10
🏗️Proposed Floors13
✅Sanctioned13
🏗️Proposed Floors13
✅Sanctioned13
Apartment Configurations
RAPID RESIDENCY PHASE 1 BLDG NO 10
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
22.54
2
2
0
100%
RESIDENTIAL
22.95
12
3
9
25%
RESIDENTIAL
22.99
3
2
1
67%
RAPID RESIDENCY PHASE 1 BLDG NO 11
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
22.54
2
2
0
100%
RESIDENTIAL
22.95
12
12
0
100%
RAPID RESIDENCY PHASE 1 BLDG NO 12
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESDENTIAL
43.93
3
3
0
100%
RESIDENTIAL
48.54
3
3
0
100%
RESIDENTIAL
52.29
3
3
0
100%
RAPID RESIDENCY PHASE 1 BLDG NO 13
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
47.56
6
6
0
100%
RAPID RESIDENCY PHASE 1 BLDG NO 5 6 7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
REISDENTIAL
24.21
4
3
1
75%
RESIDENTIAL
22.36
4
4
0
100%
RESIDENTIAL
22.55
11
10
1
91%
RESIDENTIAL
22.8
12
8
4
67%
RESIDENTIAL
22.85
3
3
0
100%
RESIDENTIAL
22.96
21
19
2
90%
RESIDENTIAL
23.2
3
1
2
33%
RESIDENTIAL
34.61
1
1
0
100%
RESIDENTIAL
35.48
3
3
0
100%
RAPID RESIDENCY PHASE 1 BLDG NO 8
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
22.58
2
1
1
50%
RESIDENTIAL
22.99
6
5
1
83%
RESIDENTIAL
34.22
6
6
0
100%
RAPID RESIDENCY PHASE 1 BLDG NO 9
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
22.54
2
0
2
0%
RESIDENTIAL
22.95
12
9
3
75%
RESIDENTIAL
22.99
3
2
1
67%
RAPID RESIDENCY PHASE 2 BLDG NO 1 2 3 4 5 6 8 10
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
18.25
4
4
0
100%
RESIDENTIAL
18.55
24
19
5
79%
RESIDENTIAL
18.81
2
2
0
100%
RESIDENTIAL
19.12
20
18
2
90%
RESIDENTIAL
19.5
12
11
1
92%
RESIDENTIAL
19.59
26
24
2
92%
RESIDENTIAL
20.35
6
3
3
50%
RESIDENTIAL
20.49
12
10
2
83%
RESIDENTIAL
21.02
4
2
2
50%
RESIDENTIAL
21.25
18
15
3
83%
RESIDENTIAL
21.45
4
4
0
100%
RESIDENTIAL
34.96
4
3
1
75%
SHOP
8.89
2
1
1
50%
SHOP
9.42
2
0
2
0%
SHOP
11.07
1
0
1
0%
SHOP
11.27
5
0
5
0%
SHOP
11.86
1
0
1
0%
SHOP
34.7
1
0
1
0%
RAPID RESIDENCY PHASE 2 BLDG NO 11 13 14
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
18.81
6
6
0
100%
RESIDENTIAL
19.77
18
17
1
94%
RESIDENTIAL
19.95
18
14
4
78%
RESIDENTIAL
21.25
9
8
1
89%
RAPID RESIDENCY PHASE 2 BLDG NO 7 9 12 15 16
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
25.47
24
16
8
67%
RESIDENTIAL
26.79
4
4
0
100%
RESIDENTIAL
27.32
8
8
0
100%
RESIDENTIAL
27.93
12
9
3
75%
RESIDENTIAL
28.27
24
11
13
46%
RAPID RESIDENCY PHASE 3 BLG NO 1 2 AND 3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMERCIAL
6.28
1
0
1
0%
COMMERCIAL
6.46
2
0
2
0%
COMMERCIAL
7.27
1
0
1
0%
COMMERCIAL
11.1
3
0
3
0%
COMMERCIAL
11.75
2
0
2
0%
COMMERCIAL
11.97
2
0
2
0%
COMMERCIAL
13.25
1
0
1
0%
COMMERCIAL
14.0
1
0
1
0%
COMMERCIAL
22.81
2
0
2
0%
COMMERCIAL
24.63
3
0
3
0%
RESIDENTIAL
28.23
28
6
22
21%
RESIDENTIAL
30.49
84
10
74
12%
Construction Progress
RAPID RESIDENCY PHASE 1 BLDG NO 10
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 1 BLDG NO 11
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 1 BLDG NO 12
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 1 BLDG NO 13
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 1 BLDG NO 5 6 7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 1 BLDG NO 8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 1 BLDG NO 9
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 2 BLDG NO 1 2 3 4 5 6 8 10
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 2 BLDG NO 11 13 14
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 2 BLDG NO 7 9 12 15 16
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RAPID RESIDENCY PHASE 3 BLG NO 1 2 AND 3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RERA Registered Amenities
✅Aggregate area of recreational Open Space25%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths35%
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
⬜Solid Waste Management And Disposal
✅Storm Water Drains50%
✅Street Lighting20%
⬜Treatment And Disposal Of Sewage And Sullage Water