Rassaz Greens Tower C D And E

by Rassaz Infrastructure Private Limited Company
Certificate SignedP51700021650
Rassaz Greens Tower C D And EProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700021650
Registration No.
REA51700058106
Registration Date
2021-09-08
Developer
Rassaz Infrastructure Private Limited Company
Architect
Avinash Mhatre And Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-04-01
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
5960.87 sq.m
Total FSI
15376.86
Approved FSI
1244.57
MahaRERA QR
Rassaz Greens Tower C D And E
MahaRERA — P51700021650
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
🏗️Proposed Floors25
Sanctioned25
🏗️Proposed Floors25
Sanctioned25

Apartment Configurations

Tower C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK68.0342240
5%
2 BHK74.69202
0%
2 BHK75.14101
0%
2 BHK78.35101
0%
3 BHK85.1240238
5%
3 BHK161.5101
0%
3 BHK218.05101
0%

Tower D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK43.0646244
4%
2 BHK68.4140238
5%
2 BHK71.42404
0%

Tower E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK43.0646244
4%
2 BHK68.3640238
5%
2 BHK71.84202
0%
2 BHK71.88202
0%

Construction Progress

TOWER C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

TOWER D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises35%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
Stilt Floor100%

TOWER E

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises35%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
Stilt Floor100%

RERA Registered Amenities

Aggregate area of recreational Open Space10%
Community Buildings
Electrical meter room, sub-station, receiving station30%
Energy managemcnt
Fire protection and fire safety requirements55%
Internal Roads & Footpaths80%
Landscaping & Tree Planting85%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)90%
Solid Waste Management And Disposal
Storm Water Drains87%
Street Lighting45%
Treatment And Disposal Of Sewage And Sullage Water
Water Supply56%
Water conservation /Rain water harvesting85%