Renuka Complex

by Anupam A Giri
Certificate SignedP99000028557
Renuka ComplexProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000028557
Developer
Anupam A Giri
Architect
Nandadeep M Kokane
Project Bank
Axis Bank Ltd
Proposed Possession
2023-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
2179.30 sq.m
Total FSI
2179.30
MahaRERA QR
Renuka Complex
MahaRERA — P99000028557
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors4
✅Sanctioned4
🏗️Proposed Floors4
✅Sanctioned4

Apartment Configurations

RENUKA COMPLEX A TYPE

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK38.015015
0%
2BHK48.0606
0%

RENUKA COMPLEX B TYPE

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK45.2524024
0%

Construction Progress

RENUKA COMPLEX A TYPE

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%

RENUKA COMPLEX B TYPE

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space25%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths75%
⬜Landscaping & Tree Planting
✅Open Parking65%
✅Sewerage (Chamber, Lines, Septic Tank , STP)80%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
✅Street Lighting50%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply75%
⬜Water conservation /Rain water harvesting