Riddhi Siddhi Complex

by Riddhi Siddhi Developers
Certificate SignedP52000009743
Riddhi Siddhi ComplexProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000009743
Registration No.
REA52000017620
Developer
Riddhi Siddhi Developers
Project Bank
Abhudaya Co-op Bank Ltd
Proposed Possession
2026-12-30
Revised Possession
2026-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
4
Project Area
10518.00 sq.m
Total FSI
11910.73
Approved FSI
5212.50
MahaRERA QR
Riddhi Siddhi Complex
MahaRERA — P52000009743
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
✅Sanctioned13
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors13
✅Sanctioned13
🏗️Proposed Floors18
✅Sanctioned18

Apartment Configurations

Building Number - 4 E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.1744044
0%
2 BHK45.5644044
0%

Building Number-1 C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.1824915
38%

Building Number-2 F Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1.5BHK40.3822022
0%
1BHK32.1322022
0%
1BHK33.1722022
0%
2 BHK45.5622022
0%

Building number - 3 D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.181280128
0%

Construction Progress

Building Number - 4 E

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Building Number-1 C Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor0%

Building Number-2 F Wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Building number - 3 D

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths50%
✅Landscaping & Tree Planting40%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply60%
⬜Water conservation /Rain water harvesting