Ridhi Sidhi

by Kesar Infra Llp Partnership
Certificate SignedP51800046974
Ridhi SidhiProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800046974
Registration No.
REA51800116055
Registration Date
2025-08-25
Developer
Kesar Infra Llp Partnership
Architect
ASHISH SOLANKI
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
130
Units Sold
21 (16%)
Buildings
4
Project Area
3155.15 sq.m
Total FSI
8516.23
Approved FSI
7758.23
MahaRERA QR
Ridhi Sidhi
MahaRERA — P51800046974
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
✅Sanctioned13
🏠Habitable12
🔢Total Units24
🏡Residential24
🏗️Proposed Floors13
✅Sanctioned13
🏠Habitable12
🔢Total Units38
🏡Residential38
🏗️Proposed Floors13
✅Sanctioned13
🏠Habitable12
🔢Total Units39
🏡Residential39
🏗️Proposed Floors13
✅Sanctioned13
🏠Habitable12
🔢Total Units29
🏡Residential29

Apartment Configurations

WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK52.68202
0%
2BHK62.62220
100%

WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK34.47211
50%
1BHK36.7101
0%
1BHK40.23101
0%

WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK44.78110
100%
2.5BHK82.78615
17%
2BHK62.62835
38%
2BHK72.65624
33%

WING D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK68.56716
14%
3BHK87.71028
20%
3BHK108.97321
67%

Construction Progress

WING A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

WING B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

WING C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING D

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
⬜Energy managemcnt
✅Fire protection and fire safety requirements50%
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)75%
✅Solid Waste Management And Disposal
✅Storm Water Drains70%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting75%