Rising Residency

by RISING BUILDERS AND DEVELOPERS Partnership
Certificate SignedP52000055969
Rising ResidencyProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000055969
Registration No.
REA52000155169
Registration Date
2024-05-02
Developer
RISING BUILDERS AND DEVELOPERS Partnership
Architect
Rajesh Khaire (Khaire & Associates)
Project Bank
STATE BANK OF INDIA
Proposed Possession
2031-04-30
Units Sold
0
Buildings
3
Project Area
3160.00 sq.m
Total FSI
7579.17
Approved FSI
7506.56
MahaRERA QR
Rising Residency
MahaRERA — P52000055969
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
✅Sanctioned7
🏗️Proposed Floors7
✅Sanctioned7
🏗️Proposed Floors7
✅Sanctioned7

Apartment Configurations

Rising Residency A wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK41.3707
0%
1BHK41.84707
0%
1BHK42.1814014
0%
2BHK54.5214014
0%
Shop15.97202
0%
Shop19.97303
0%
Shop20.3101
0%
Shop21.77101
0%
Shop22.13101
0%

Rising Residency B wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK40.5614014
0%
1BHK41.9114014
0%
1BHK42.1814014
0%
Shop13.97101
0%
Shop15.64101
0%
Shop19.55101
0%
Shop19.87101
0%
Shop20.65101
0%
Shop23.7101
0%
Shop25.82202
0%
Shop26.27101
0%

Rising Residency C wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK40.928028
0%

Construction Progress

Rising Residency A wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Rising Residency B wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Rising Residency C wing

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
⬜Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
⬜Open Parking
⬜Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
⬜Water Supply
⬜Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now