📞 +91 98200 30685 ✉️
RERA: A51800043517

Roop Rajat Park Phase 3

by MAHAVIR ASSOCIATES Partnership
Certificate Signed P99000046640
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000046640
Registration No.
REA99000112724
Registration Date
2022-08-25
Developer
MAHAVIR ASSOCIATES Partnership
Architect
Pranav Deshmukh
Project Bank
IDBI BANK
Proposed Possession
2027-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
420
Units Sold
323 (77%)
Buildings
38
Project Area
34156.00 sq.m
Total FSI
163561.00
Approved FSI
163561.00
MahaRERA QR
Roop Rajat Park Phase 3
MahaRERA — P99000046640
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
Sanctioned20
🏠Habitable7
🔢Total Units14
🏡Residential14
📅Completion2027-03-31
🏗️Proposed Floors20
Sanctioned20
🏠Habitable7
🔢Total Units14
🏡Residential14
📅Completion2027-03-31
🏗️Proposed Floors21
Sanctioned21
🏠Habitable7
🔢Total Units28
🏡Residential28
📅Completion2027-03-31
🏗️Proposed Floors58
Sanctioned58
🏠Habitable6
🔢Total Units38
🏡Residential20
🏢Non-Residential18
📅Completion2027-03-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable6
🔢Total Units51
🏡Residential18
🏢Non-Residential33
📅Completion2027-03-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable6
🔢Total Units44
🏡Residential20
🏢Non-Residential24
📅Completion2027-03-31
🏗️Proposed Floors16
Sanctioned16
🏠Habitable7
🔢Total Units14
🏡Residential14
📅Completion2027-03-31
🏗️Proposed Floors16
Sanctioned16
🏠Habitable7
🔢Total Units14
🏡Residential14
📅Completion2027-03-31
🏗️Proposed Floors16
Sanctioned16
🏠Habitable7
🔢Total Units14
🏡Residential14
📅Completion2027-03-31
🏗️Proposed Floors14
Sanctioned14
🏠Habitable7
🔢Total Units14
🏡Residential14
📅Completion2027-03-31
🏗️Proposed Floors10
Sanctioned10
🏠Habitable7
🔢Total Units16
🏡Residential14
🏢Non-Residential2
📅Completion2027-03-31
🏗️Proposed Floors14
Sanctioned14
🏠Habitable7
🔢Total Units34
🏡Residential28
🏢Non-Residential6
📅Completion2027-03-31
🏗️Proposed Floors14
Sanctioned14
🏠Habitable7
🔢Total Units34
🏡Residential28
🏢Non-Residential6
📅Completion2027-03-31
🏗️Proposed Floors14
Sanctioned14
🏠Habitable7
🔢Total Units34
🏡Residential28
🏢Non-Residential6
📅Completion2027-03-31
🏗️Proposed Floors14
Sanctioned14
🏠Habitable7
🔢Total Units34
🏡Residential28
🏢Non-Residential6
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors3
Sanctioned3
🏠Habitable2
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking2
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31
🏗️Proposed Floors2
Sanctioned2
🏠Habitable1
🔢Total Units1
🏡Residential1
🚗Open Parking1
📅Completion2027-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 58.689998626708984 0 0 0
0%
2Bhk 59.52000045776367 0 0 0
0%
2Bhk 60.310001373291016 0 0 0
0%
2Bhk 64.12999725341797 0 0 0
0%
2Bhk 65.70999908447266 0 0 0
0%
2Bhk 65.73999786376953 0 0 0
0%
2Bhk 65.97000122070312 0 0 0
0%
2Bhk 67.11000061035156 0 0 0
0%
2Bhk 67.7300033569336 0 0 0
0%
3Bhk 89.87999725341797 0 0 0
0%
3Bhk 101.56999969482422 0 0 0
0%
4Bhk 121.7699966430664 0 0 0
0%
4Bhk 136.60000610351562 0 0 0
0%
Bungalow 125.87000274658203 0 0 0
0%
Bungalow 184.1699981689453 0 0 0
0%
Bungalow 258.3800048828125 0 0 0
0%
Shop 18.219999313354492 0 0 0
0%
Shop 18.829999923706055 0 0 0
0%
Shop 25.06999969482422 0 0 0
0%
Shop 25.489999771118164 0 0 0
0%
Shop 26.729999542236328 0 0 0
0%
Shop 27.56999969482422 0 0 0
0%
Shop 29.1299991607666 0 0 0
0%
Shop 32.22999954223633 0 0 0
0%
Shop 32.470001220703125 0 0 0
0%
Shop 33.560001373291016 0 0 0
0%
Shop 33.56999969482422 0 0 0
0%
Shop 33.70000076293945 0 0 0
0%
Shop 33.779998779296875 0 0 0
0%
Shop 34.95000076293945 0 0 0
0%
Shop 35.290000915527344 0 0 0
0%
Shop 35.599998474121094 0 0 0
0%
Shop 39.38999938964844 0 0 0
0%
Shop 39.68000030517578 0 0 0
0%
Shop 41.02000045776367 0 0 0
0%
Shop 41.290000915527344 0 0 0
0%
Shop 42.099998474121094 0 0 0
0%
Shop 73.52999877929688 0 0 0
0%

Roop Rajat Park Sector 1 Bld 11

Type Carpet (sq.ft) Total Booked Available Status
4 BHK 136.6 14 11 3
79%

Roop Rajat Park Sector 1 Bld 12

Type Carpet (sq.ft) Total Booked Available Status
4 BHK 121.77 14 6 8
43%

Roop Rajat Park Sector 1 Bld 16

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 89.88 28 25 3
89%

Roop Rajat Park Sector 1 Bld 2 A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 64.13 18 13 5
72%
2 BHK 65.74 1 0 1
0%
2 BHK 67.73 1 1 0
100%
Shop 29.13 8 3 5
38%
Shop 32.23 4 2 2
50%
Shop 35.6 4 4 0
100%
Shop 39.39 2 2 0
100%

Roop Rajat Park Sector 1 Bld 2 B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 64.13 15 8 7
53%
2 BHK 65.97 1 1 0
100%
2 BHK 67.11 1 0 1
0%
2 BHK 67.73 1 0 1
0%
Shop 25.49 2 0 2
0%
Shop 27.57 2 1 1
50%
Shop 29.13 6 3 3
50%
Shop 32.23 6 0 6
0%
Shop 33.56 2 1 1
50%
Shop 33.7 1 1 0
100%
Shop 33.78 2 1 1
50%
Shop 34.95 1 1 0
100%
Shop 35.6 3 3 0
100%
Shop 39.39 3 3 0
100%
Shop 41.02 1 0 1
0%
Shop 41.29 1 1 0
100%
Shop 42.1 2 0 2
0%
Shop 73.53 1 0 1
0%

Roop Rajat Park Sector 1 Bld 2 C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 64.13 18 12 6
67%
2 BHK 65.71 1 1 0
100%
2 BHK 67.73 1 1 0
100%
Shop 29.13 8 0 8
0%
Shop 32.23 4 0 4
0%
Shop 32.47 2 1 1
50%
Shop 33.57 2 0 2
0%
Shop 35.6 4 2 2
50%
Shop 39.39 2 2 0
100%
Shop 39.68 1 0 1
0%
Shop 41.02 1 0 1
0%

Roop Rajat Park Sector 1 Bld 5 A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 101.57 14 9 5
64%

Roop Rajat Park Sector 1 Bld 5 B

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 101.57 14 11 3
79%

Roop Rajat Park Sector 1 Bld 5 C

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 101.57 14 11 3
79%

Roop Rajat Park Sector 3 Bld 6A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.52 14 12 2
86%

Roop Rajat Park Sector 3 Bld 6B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.52 13 11 2
85%
2 BHK 60.31 1 1 0
100%
Shop 26.73 1 1 0
100%
Shop 35.29 1 1 0
100%

Roop Rajat Park Sector 3 Bld 7A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 58.69 28 24 4
86%
Shop 18.22 2 2 0
100%
Shop 18.83 2 2 0
100%
Shop 25.07 2 2 0
100%

Roop Rajat Park Sector 3 Bld 7B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 58.69 28 22 6
79%
Shop 18.22 2 2 0
100%
Shop 18.83 2 2 0
100%
Shop 25.07 2 1 1
50%

Roop Rajat Park Sector 3 Bld 8A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 58.69 28 21 7
75%
Shop 18.22 2 2 0
100%
Shop 18.83 2 0 2
0%
Shop 25.07 2 2 0
100%

Roop Rajat Park Sector 3 Bld 8B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 58.69 28 17 11
61%
Shop 18.22 2 1 1
50%
Shop 18.83 2 1 1
50%
Shop 25.07 2 2 0
100%

Roop Rajat Park Sector 4 Bunglow G1

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 0 1
0%

Roop Rajat Park Sector 4 Bunglow G2

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 0 1
0%

Roop Rajat Park Sector 4 Bunglow G3

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 0 1
0%

Roop Rajat Park Sector 4 Bunglow G4

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 0 1
0%

Roop Rajat Park Sector 4 Bunglow G5

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 0 1
0%

Roop Rajat Park Sector 4 Bunglow G6

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 1 0
100%

Roop Rajat Park Sector 4 Bunglow G7

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 258.38 1 1 0
100%

Roop Rajat Park Sector 4 Rh A3

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 184.17 1 1 0
100%

Roop Rajat Park Sector 4 Rh A4

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 184.17 1 0 1
0%

Roop Rajat Park Sector 4 Rh A5

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 184.17 1 0 1
0%

Roop Rajat Park Sector 4 Rh A6

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 184.17 1 0 1
0%

Roop Rajat Park Sector 4 Rh A7

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 184.17 1 0 1
0%

Roop Rajat Park Sector 4 Rh B1

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 0 1
0%

Roop Rajat Park Sector 4 Rh B10

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B11

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B2

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B3

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B4

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B5

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B6

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 0 1
0%

Roop Rajat Park Sector 4 Rh B7

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 2 1 1
50%

Roop Rajat Park Sector 4 Rh B8

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 1 0
100%

Roop Rajat Park Sector 4 Rh B9

Type Carpet (sq.ft) Total Booked Available Status
Bungalow 125.87 1 0 1
0%

Construction Progress

NA Plot Without Structure

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Roop Rajat Park Sector 1 Bld 11

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing51%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 12

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing51%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 16

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 2 A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing53%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 2 B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing53%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 2 C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing53%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 5 A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing53%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 5 B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing53%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 1 Bld 5 C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing53%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 3 Bld 6A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 3 Bld 6B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 3 Bld 7A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 3 Bld 7B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 3 Bld 8A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing48%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 3 Bld 8B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing48%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 Bunglow G1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 Bunglow G2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 Bunglow G3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 Bunglow G4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 Bunglow G5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 Bunglow G6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 Bunglow G7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Roop Rajat Park Sector 4 RH A3

Basement (if any)100%

Roop Rajat Park Sector 4 Rh A3

Excavation100%

Roop Rajat Park Sector 4 RH A3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh A3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH A3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh A3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Roop Rajat Park Sector 4 RH A3

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh A3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH A3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh A3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH A3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Roop Rajat Park Sector 4 Rh A3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH A4

Basement (if any)100%

Roop Rajat Park Sector 4 Rh A4

Excavation100%

Roop Rajat Park Sector 4 RH A4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh A4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH A4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh A4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Roop Rajat Park Sector 4 RH A4

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh A4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH A4

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh A4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH A4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Roop Rajat Park Sector 4 Rh A4

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH A5

Basement (if any)100%

Roop Rajat Park Sector 4 Rh A5

Excavation100%

Roop Rajat Park Sector 4 RH A5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh A5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH A5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh A5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Roop Rajat Park Sector 4 RH A5

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh A5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH A5

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh A5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH A5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Roop Rajat Park Sector 4 Rh A5

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH A6

Basement (if any)100%

Roop Rajat Park Sector 4 Rh A6

Excavation100%

Roop Rajat Park Sector 4 RH A6

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh A6

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH A6

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh A6

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Roop Rajat Park Sector 4 RH A6

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh A6

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH A6

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh A6

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH A6

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Roop Rajat Park Sector 4 Rh A6

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH A7

Basement (if any)100%

Roop Rajat Park Sector 4 Rh A7

Excavation100%

Roop Rajat Park Sector 4 RH A7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh A7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH A7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh A7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Roop Rajat Park Sector 4 RH A7

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh A7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH A7

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh A7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH A7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Roop Rajat Park Sector 4 Rh A7

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B1

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B1

Excavation100%

Roop Rajat Park Sector 4 RH B1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B1

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B10

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B10

Excavation100%

Roop Rajat Park Sector 4 RH B10

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B10

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B10

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B10

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B10

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B10

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B10

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B10

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B10

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B10

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B11

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B11

Excavation100%

Roop Rajat Park Sector 4 RH B11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B11

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B11

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B2

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B2

Excavation100%

Roop Rajat Park Sector 4 RH B2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B2

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B3

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B3

Excavation100%

Roop Rajat Park Sector 4 RH B3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B3

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B4

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B4

Excavation100%

Roop Rajat Park Sector 4 RH B4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B4

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B4

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B4

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B5

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B5

Excavation100%

Roop Rajat Park Sector 4 RH B5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B5

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B5

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B5

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B6

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B6

Excavation100%

Roop Rajat Park Sector 4 RH B6

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B6

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B6

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B6

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B6

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B6

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B6

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B6

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B6

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B6

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B7

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B7

Excavation100%

Roop Rajat Park Sector 4 RH B7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B7

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B7

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B7

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B8

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B8

Excavation100%

Roop Rajat Park Sector 4 RH B8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B8

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B8

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B8

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Roop Rajat Park Sector 4 RH B9

Basement (if any)100%

Roop Rajat Park Sector 4 Rh B9

Excavation100%

Roop Rajat Park Sector 4 RH B9

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Roop Rajat Park Sector 4 Rh B9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Roop Rajat Park Sector 4 RH B9

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Roop Rajat Park Sector 4 Rh B9

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

Roop Rajat Park Sector 4 RH B9

Plinth100%
Podiums (if any) 0%

Roop Rajat Park Sector 4 Rh B9

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Roop Rajat Park Sector 4 RH B9

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Roop Rajat Park Sector 4 Rh B9

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Roop Rajat Park Sector 4 RH B9

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Roop Rajat Park Sector 4 Rh B9

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains 50%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.