Royal Residency C Phase I

by Devang Hemantkumar Vyas Individual
Certificate SignedP51900012122
Royal Residency C Phase IProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900012122
Registration No.
REA51900016235
Registration Date
2024-01-31
Developer
Devang Hemantkumar Vyas Individual
Architect
Redkar And Redkar
Project Bank
UNION BANK OF INDIA
Proposed Possession
2025-08-27
Revised Possession
2018-01-31
Extended Possession
2025-08-27
Units Sold
0
Buildings
1
Project Area
8111.14 sq.m
Total FSI
1500.83
Approved FSI
1500.83
MahaRERA QR
Royal Residency C Phase I
MahaRERA — P51900012122
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
✅Sanctioned12

Apartment Configurations

ROYAL RESIDENCY C PHASE I

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK60.6218180
100%

Construction Progress

ROYAL RESIDENCY C PHASE I

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths100%
⬜Landscaping & Tree Planting
✅Open Parking100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%