S S Dream CityProject photos will appear here when available.
Project Information
RERA Certificate No.
P99000009894
Registration No.
REA99000020886
Developer
Sanjay Yadav
Project Bank
BASSEIN CATHOLIC CO OP BANK
Proposed Possession
2024-01-30
Revised Possession
2024-01-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
12
Project Area
7467.83 sq.m
Total FSI
11919.86
Approved FSI
4452.03
S S Dream City MahaRERA — P99000009894
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors8
✅Sanctioned8
🏗️Proposed Floors8
✅Sanctioned8
Apartment Configurations
S S DREAM CITY BLDG 5 WING A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.72
8
0
8
0%
1BHK
31.03
4
0
4
0%
1BHK
33.02
3
0
3
0%
1BHK
33.29
4
0
4
0%
1BHK
33.87
4
0
4
0%
S S DREAM CITY BLDG 5 WING B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.72
8
0
8
0%
1BHK
31.03
4
0
4
0%
1BHK
33.02
3
0
3
0%
1BHK
33.29
4
0
4
0%
1BHK
33.87
4
0
4
0%
S S DREAM CITY BUILDING NO 1 WING A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.44
8
0
8
0%
1BHK
28.24
11
0
11
0%
1BHK
30.66
4
0
4
0%
1BHK
34.16
4
0
4
0%
S S DREAM CITY BUILDING NO 1 WING B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.72
15
0
15
0%
1BHK
31.03
4
0
4
0%
1BHK
33.87
4
0
4
0%
S S DREAM CITY BUILDING NO 2 WING A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
12.34
1
0
1
0%
1BHK
23.12
1
0
1
0%
1BHK
26.72
18
0
18
0%
1BHK
31.03
4
0
4
0%
1BHK
33.87
4
0
4
0%
Shop
8.16
1
0
1
0%
Shop
10.97
1
0
1
0%
Shop
14.6
1
0
1
0%
Shop
15.68
1
0
1
0%
Shop
19.97
1
0
1
0%
S S DREAM CITY BUILDING NO 2 WING B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
32.74
18
0
18
0%
Shop
5.92
1
0
1
0%
Shop
9.97
1
0
1
0%
Shop
11.38
2
0
2
0%
Shop
12.55
2
0
2
0%
Shop
13.42
1
0
1
0%
Shop
14.64
2
0
2
0%
S S DREAM CITY BUILDING NO 3 WING A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
32.74
18
0
18
0%
Shop
5.92
1
0
1
0%
Shop
9.97
1
0
1
0%
Shop
11.38
2
0
2
0%
Shop
12.55
2
0
2
0%
Shop
13.42
1
0
1
0%
Shop
14.64
2
0
2
0%
S S DREAM CITY BUILDING NO 3 WING B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
23.13
1
0
1
0%
1BHK
28.24
4
0
4
0%
1BHK
30.66
5
0
5
0%
1BHK
31.03
4
0
4
0%
1BHK
33.87
4
0
4
0%
2BHK
47.19
8
0
8
0%
Shop
8.46
1
0
1
0%
Shop
11.15
1
0
1
0%
Shop
11.45
1
0
1
0%
Shop
12.13
1
0
1
0%
Shop
12.36
1
0
1
0%
Shop
12.55
1
0
1
0%
Shop
14.81
1
0
1
0%
Shop
15.89
1
0
1
0%
S S DREAM CITY BUILDING NO 3 WING C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.44
8
0
8
0%
1BHK
34.16
4
0
4
0%
1BHK
34.34
8
0
8
0%
2BHK
46.39
3
0
3
0%
2BHK
48.48
4
0
4
0%
S S DREAM CITY BUILDING NO 4 WING A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
31.03
8
0
8
0%
2BHK
46.39
17
0
17
0%
Shop
8.16
1
0
1
0%
Shop
8.76
2
0
2
0%
Shop
11.26
1
0
1
0%
Shop
11.45
1
0
1
0%
Shop
12.13
2
0
2
0%
Shop
12.2
1
0
1
0%
Shop
12.36
1
0
1
0%
Shop
14.14
2
0
2
0%
Shop
15.68
1
0
1
0%
Shop
15.89
1
0
1
0%
Shop
25.27
1
0
1
0%
S S DREAM CITY BUILDING NO 4 WING B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.44
8
0
8
0%
1BHK
34.16
4
0
4
0%
1BHK
34.34
8
0
8
0%
2BHK
46.39
5
0
5
0%
2BHK
48.48
4
0
4
0%
Shop
7.95
1
0
1
0%
Shop
10.28
1
0
1
0%
Shop
11.06
1
0
1
0%
Shop
12.04
1
0
1
0%
Shop
12.34
1
0
1
0%
Shop
12.78
1
0
1
0%
Shop
14.22
1
0
1
0%
Shop
15.1
1
0
1
0%
Shop
15.47
1
0
1
0%
Shop
16.1
1
0
1
0%
S S DREAM CITY BUILDING NO 4 WING C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.44
8
0
8
0%
1BHK
28.24
11
0
11
0%
1BHK
30.66
4
0
4
0%
1BHK
34.16
4
0
4
0%
Construction Progress
S S DREAM CITY BLDG 5 WING A
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BLDG 5 WING B
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 1 WING A
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 1 WING B
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 2 WING A
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 2 WING B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 3 WING A
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 3 WING B
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 3 WING C
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 4 WING A
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 4 WING B
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
S S DREAM CITY BUILDING NO 4 WING C
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
⬜Aggregate area of recreational Open Space
✅Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water