SAGAR SARGAM RESIDENCY

by Shree Tulsi Developes Partnership
Certificate SignedP52000009713
SAGAR SARGAM RESIDENCYProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000009713
Registration No.
REA52000020113
Registration Date
2021-09-09
Developer
Shree Tulsi Developes Partnership
Architect
Structilis Consultants Pvt Ltd
Project Bank
BANK OF BARODA
Proposed Possession
2027-07-31
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Total Units
127
Units Sold
48 (38%)
Buildings
5
Project Area
3640.00 sq.m
Total FSI
3607.73
Approved FSI
3607.73
MahaRERA QR
SAGAR SARGAM RESIDENCY
MahaRERA — P52000009713
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable4
🔢Total Units53
🏡Residential49
🏢Non-Residential4
🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable5
🔢Total Units28
🏡Residential28
🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable4
🔢Total Units18
🏡Residential18
🏗️Proposed Floors5
✅Sanctioned5
🔢Total Units26
🏡Residential26
🏗️Proposed Floors2
✅Sanctioned2
🔢Total Units2
🏡Residential2

Apartment Configurations

Building No 1 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.79404
0%
1BHK31.14826
25%
1BHK31.15404
0%
1BHK37.23404
0%
1RK21.43404
0%
2BHK49.77413
25%
Shop9.02101
0%
Shop10.94101
0%

Building No 2 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK20.7828280
100%

Building No 3 Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK22.67770
100%
2 BHK34.46880
100%

Building No 4 Wing D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK22.59000
0%
2 BHK33.64000
0%

Building No 5 Wing E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FIRST FLOOR30.86000
0%
GROUND FLOOR30.86000
0%

Construction Progress

Building No 1 Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%

Building No 2 Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

Building No 3 Wing C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

Building No 4 Wing D

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

Building No 5 Wing E

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station75%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting50%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)75%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply75%
⬜Water conservation /Rain water harvesting