📞 +91 98200 30685✉️
RERA: A51800043517

Sai Baba Nagar Residential With Shopline Building With A B C Wings

by Shreeji Associates
Kept in AbeyanceP99000015106

Project Information

RERA Certificate No.
P99000015106
Registration No.
REA99000031762
Developer
Shreeji Associates
Project Bank
Bassein Catholic Cooperative Bank Limited
Proposed Possession
2026-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
20230.00 sq.m
Total FSI
24518.13
Approved FSI
21079.57
MahaRERA QR
Sai Baba Nagar Residential With Shopline Building With A B C Wings
MahaRERA — P99000015106
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking50
🅿️Closed Parking1
📅Completion2025-12-31
🚗Open Parking48
🅿️Closed Parking1
📅Completion2025-12-31
🚗Open Parking16
🅿️Closed Parking1
📅Completion2025-12-31

Apartment Configurations

Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.2720020
0%
1 BHK33.8520020
0%
1 BHK33.9620020
0%
1 BHK35.8620020
0%
1 BHK36.2120020
0%
2 BHK49.9620020
0%
2 BHK50.0320020
0%
2 BHK50.710010
0%
2 BHK50.820020
0%
2 BHK52.0120020
0%
Shop14.5101
0%
Shop15.23101
0%
Shop17.54101
0%
Shop17.56101
0%
Shop18.13101
0%
Shop18.25202
0%
Shop22.48101
0%

Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.1820020
0%
1 BHK33.2720020
0%
1 BHK33.5740040
0%
1 BHK33.8520020
0%
1 BHK33.9620020
0%
2 BHK49.5820020
0%
2 BHK49.8920020
0%
Shop12.87101
0%
Shop14.1101
0%
Shop14.35101
0%
Shop16.32101
0%
Shop17.4101
0%
Shop17.85101
0%
Shop17.96101
0%
Shop18.65101
0%
Shop18.95101
0%
Shop19.65101
0%
Shop21.27101
0%
Shop21.99101
0%
Shop22.46101
0%
Shop24.93101
0%

Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.8640040
0%
1 BHK28.3780080
0%
1 BHK28.9320020
0%
1 BHK29.0720020
0%
Shop10.16101
0%
Shop10.43202
0%
Shop12.71101
0%
Shop12.79202
0%
Shop15.01101
0%
Shop17.43101
0%
Shop17.95101
0%
Shop18.41101
0%
Shop18.74101
0%
Shop23.15101
0%

Construction Progress

Wing A

Excavation70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing7%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Wing B

Excavation70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing7%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Wing C

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now