Excavation100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
X number of Slabs of Super Structure90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
Overall Percentage of Completion of the work done For the entire Building /Wing51%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
Overall Percentage of Completion of the work done For the entire Building /Wing36%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises25%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%