Samruddhi Residency Phase-1

by Dharmi Constructions
Certificate SignedP99000020901
Samruddhi Residency Phase-1Project photos will appear here when available.

Project Information

RERA Certificate No.
P99000020901
Developer
Dharmi Constructions
Project Bank
HDFC Bank
Proposed Possession
2027-12-31
Revised Possession
1900-01-01
Extended Possession
2025-05-29
Total Units
86
Units Sold
32 (37%)
Buildings
3
Project Area
3000.00 sq.m
Total FSI
2781.73
MahaRERA QR
Samruddhi Residency Phase-1
MahaRERA — P99000020901
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units29
🏡Residential29
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units30
🏡Residential30
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units27
🏡Residential27

Apartment Configurations

Building No-3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK50.4404
0%
FLAT27.99101
0%
FLAT28.15110
100%
FLAT28.55110
100%
FLAT29.08101
0%
FLAT31.1422
50%
FLAT33.94404
0%
FLAT34.2512102
83%
FLAT34.55110
100%

Building No-4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT20.15110
100%
FLAT26.44404
0%
FLAT26.85101
0%
FLAT27.57101
0%
FLAT31.1110
100%
FLAT34.2516610
38%
FLAT41.18110
100%
FLAT50.5431
75%

Building No-5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT17.94303
0%
FLAT22.07808
0%
FLAT22.4515015
0%
FLAT24.91101
0%

Construction Progress

Building No-3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
Stilt Floor100%

Building No-4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
Stilt Floor100%

Building No-5

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths
⬜Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting