RERA: A51800043517

Samruddhi Residency Phase-1

by Dharmi Constructions
Kept in AbeyanceP99000020901

Project Information

RERA Certificate No.
P99000020901
Developer
Dharmi Constructions
Project Bank
HDFC Bank
Proposed Possession
2024-05-30
Revised Possession
1900-01-01
Extended Possession
2025-05-29
Buildings
3
Project Area
3000.00 sq.m
Total FSI
2781.73
MahaRERA QR
Samruddhi Residency Phase-1
MahaRERA — P99000020901
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking2
🅿️Closed Parking1
📅Completion2023-05-31
🚗Open Parking2
🅿️Closed Parking1
📅Completion2023-05-31
🚗Open Parking4
🅿️Closed Parking1
📅Completion2023-05-31

Apartment Configurations

Building No-3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK50.4404
0%
FLAT27.99101
0%
FLAT28.15110
100%
FLAT28.55110
100%
FLAT29.08101
0%
FLAT31.1422
50%
FLAT33.94404
0%
FLAT34.2512102
83%
FLAT34.55110
100%

Building No-4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT20.15110
100%
FLAT26.44404
0%
FLAT26.85101
0%
FLAT27.57101
0%
FLAT31.1110
100%
FLAT34.2516610
38%
FLAT41.18110
100%
FLAT50.5431
75%

Building No-5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT17.94303
0%
FLAT22.07808
0%
FLAT22.4515015
0%
FLAT24.91101
0%

Construction Progress

Building No-3

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing58%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure60%

Building No-4

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing58%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure60%

Building No-5

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now