RERA: A51800043517

Sant Krupa Complex

by Swami Enterprises
Kept in AbeyanceP99000020121

Project Information

RERA Certificate No.
P99000020121
Developer
Swami Enterprises
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2023-10-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
4255.00 sq.m
Total FSI
4078.65
MahaRERA QR
Sant Krupa Complex
MahaRERA — P99000020121
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2022-10-31
📅Completion2022-10-31
📅Completion2022-10-31

Apartment Configurations

Building No A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL457.616016
0%
RESIDENTIAL457.6416016
0%

Building No B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL457.6416016
0%

Building No C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL445.316016
0%
RESIDENTIAL445.6916016
0%
RESIDENTIAL453.6416016
0%
RESIDENTIAL453.8516016
0%

Construction Progress

Building No A

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Overall Percentage of Completion of the work done For the entire Building /Wing44%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing85%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No B

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No C

Excavation10%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing2%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth10%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.