Sarnobat ResidencyProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700052514
Registration No.
REA51700141386
Registration Date
2025-07-24
Developer
Budharam Ganpat Sarnobat Individual
Architect
VITAN CONSULTANTS ARCHITECTS & INTERIOR DESIGNERS
Project Bank
ICICI BANK LIMITED
Proposed Possession
2028-05-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
121
Units Sold
8 (7%)
Buildings
6
Project Area
3690.00 sq.m
Total FSI
16192.28
Approved FSI
6192.28
MahaRERA QR
Sarnobat Residency
MahaRERA — P51700052514
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🔢Total Units28
🏡Residential28
🏗️Proposed Floors7
✅Sanctioned7
🔢Total Units30
🏡Residential30
🏗️Proposed Floors7
✅Sanctioned7
🔢Total Units35
🏡Residential35

Apartment Configurations

SARNOBAT RESIDENCY BUILDING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.9724024
0%
2BHK42.3808
0%

SARNOBAT RESIDENCY BUILDING D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.9724024
0%
2BHK42.3808
0%

SARNOBAT RESIDENCY BUILDING E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK25.38413
25%
1BHK31.72413
25%
1BHK32.35844
50%
1BHK35.02422
50%

SARNOBAT RESIDENCY BUILDING F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK23.59707
0%
1BHK29.29707
0%
1BHK31.91707
0%
1BHK31.94707
0%
1BHK31.98707
0%
1BHK35.37707
0%
1BHK36.19707
0%

Construction Progress

SARNOBAT RESIDENCY BUILDING C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

SARNOBAT RESIDENCY BUILDING D

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

SARNOBAT RESIDENCY BUILDING E

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%

SARNOBAT RESIDENCY BUILDING F

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting