RERA: A51800043517

Seven Heights

by Aditi Builders And Developers
Kept in Abeyance P99000047103
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000047103
Registration No.
REA99000106640
Developer
Aditi Builders And Developers
Project Bank
HDFC BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
2484.29 sq.m
Total FSI
2484.29
MahaRERA QR
Seven Heights
MahaRERA — P99000047103
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2025-12-31
📅Completion2025-12-31
📅Completion2025-12-31

Apartment Configurations

Seven Heights Buld No 2, A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.72 14 0 14
0%
1 BHK 29.96 2 0 2
0%
Shop 9.94 1 0 1
0%
Shop 10.7 2 0 2
0%
Shop 13.65 3 0 3
0%

Seven Heights Buld No2, B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.76 6 0 6
0%
1 BHK 30.83 8 0 8
0%
1 BHK 31.64 1 0 1
0%
1 BHK 32.07 1 0 1
0%
1 BHK 32.22 3 0 3
0%
1 BHK 32.8 1 0 1
0%
2 BHK 43.96 3 0 3
0%
2 BHK 44.88 1 0 1
0%
Shop 11.39 1 0 1
0%
Shop 11.6 1 0 1
0%
Shop 13.19 1 0 1
0%
Shop 13.27 1 0 1
0%
Shop 14.22 1 0 1
0%
Shop 14.48 4 0 4
0%
Shop 14.75 1 0 1
0%
Shop 16.43 1 0 1
0%
Shop 16.95 1 0 1
0%
Shop 19.01 1 0 1
0%

Seven Heights, Buld No 2, C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.72 14 0 14
0%
1 BHK 29.96 2 0 2
0%
Shop 9.94 1 0 1
0%
Shop 10.7 2 0 2
0%
Shop 13.65 3 0 3
0%

Construction Progress

Seven Heights Buld No 2, A Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Seven Heights Buld No2, B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing15%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

Seven Heights, Buld No 2, C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.