Shiv Om Project

by Shiv Om Developers
Certificate SignedP51800009318
Shiv Om ProjectProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800009318
Registration No.
REA51800013374
Developer
Shiv Om Developers
Project Bank
ORIENTAL BANK OF COMMERCE
Proposed Possession
2024-06-30
Revised Possession
2018-12-31
Extended Possession
2024-06-30
Total Units
18
Units Sold
13 (72%)
Buildings
2
Project Area
4925.40 sq.m
Total FSI
9475.79
MahaRERA QR
Shiv Om Project
MahaRERA — P51800009318
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
✅Sanctioned12
🏠Habitable12
🔢Total Units18
🏡Residential17
🏢Non-Residential1
🏗️Proposed Floors28
✅Sanctioned28
🏠Habitable28

Apartment Configurations

SHIV OM BUILDING 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK71.01798
53%
Shop106.24110
100%

SHIV OM BUILDING 2-A,B,C WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK41.2428280
100%
2BHK61.8728280
100%
2BHK64.5633330
100%
2BHK68.74110
100%
3BHK89.6531310
100%

Construction Progress

SHIV OM BUILDING 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

SHIV OM BUILDING 2-A,B,C WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
✅Community Buildings100%
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Open Parking80%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
✅Street Lighting100%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%